Beyond the standard cycle: increasing total work cell productivity by optimizing robot placement and other key performance influencers

被引:6
作者
Mahr, C [1 ]
机构
[1] Adept Technol, San Jose, CA USA
来源
INDUSTRIAL ROBOT | 2000年 / 27卷 / 05期
关键词
cycle time; robots; productivity; simulation;
D O I
10.1108/01439910010372974
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A robot's standard cycle time tends to be a primary criterion in estimating work cell through-put. Many other factors, like robot placement peripherals and optimization of the work envelope often are overlooked in the analysis. This paper provides insights into optimizing performance by considering all available options to improve cell productivity.
引用
收藏
页码:334 / 337
页数:4
相关论文
empty
未找到相关数据