RISK MANAGEMENT PROCESS ON THE PROPERTY DEVELOPMENT OF NUSA DUA RESORT BALI INDONESIA

被引:1
作者
MUKA, I. Wayan [1 ]
WIBOWO, Agung [2 ]
机构
[1] Hindu Univ Indonesia, Fac Engn, Denpasar, Indonesia
[2] Diponegoro Univ, Fac Engn, Semarang, Indonesia
关键词
Property; Risk; Hazard; Vulnerability; Capacity;
D O I
10.2478/cee-2021-0013
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This research identifies risk sources, identifies risk factors, identifies the level of danger, identifies the level of vulnerability, identifies the level of capacity and determines risk priorities. Data collection was carried out through interviews and filling out questionnaires by resource persons involved in property development in the tourism area of Nusa Dua Resort ITDC Bali Province. The results showed that the risk factors that receive priority to be continuously mitigated and monitored are: interest rate and inflation risk, design risk, land maturation risk, and development financing risk. The level of risk in the development of the Nusa Dua Resort area is in the acceptable category so that it is feasible to build. The risk management process in this research can be applied to property development projects to help interested parties make investment decisions.
引用
收藏
页码:117 / 124
页数:8
相关论文
共 13 条
  • [1] [Anonymous], 2007, WORKS C CIRIA CIRIA
  • [2] [Anonymous], 2017, P NAT MULTIDISCIPLIN
  • [3] [Anonymous], 2019, MARZUKI JUFRI GRAEME, DOI [10.15396/eres2019_79, DOI 10.15396/ERES2019_79]
  • [4] [Anonymous], 2016, SOURCE-NOTE HIST ART, DOI [10.1017/CBO9781107415324.004, DOI 10.1017/CBO9781107415324.004]
  • [5] [Anonymous], 2017, PMB GUID PROJ MAN BO
  • [6] [Anonymous], 2015, INT REFEREED J ENG S
  • [7] [Anonymous], 2010, HDB DEV EC, DOI [10.1016/B978-0-444-52944-2.00006-9, DOI 10.1016/B978-0-444-52944-2.00006-9]
  • [8] [Anonymous], PROCEDIA SOCIAL BEHA, DOI [10.1016/j.sbspro.2016.06.130, DOI 10.1016/J.SBSPRO.2016.06.130]
  • [9] BASUKI, 2012, INV RISK MAN HOUS DE
  • [10] DARMANTO EKO, 2014, APPL AHP ANALYTHIC H