共 32 条
[21]
A correct and scalable deadlock avoidance policy for flexible manufacturing systems
[J].
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION,
1998, 14 (05)
:796-809
[22]
LEE DY, 1994, IEEE T ROBOTIC AUTOM, V10, P123, DOI 10.1109/70.282537
[24]
Pinedo M., 1995, Scheduling: Theory, Algorithms, and Systems, V2nd
[25]
DYNAMIC JOB SHOP SCHEDULING - A SURVEY OF SIMULATION RESEARCH
[J].
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE,
1990, 18 (01)
:43-57
[26]
Deadlock-free schedules for automated manufacturing workstations
[J].
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION,
1996, 12 (03)
:391-400
[27]
Shoshani A., 1970, P 11 ANN S SWITCH AU, P225
[28]
SONG W, 1994, NEW DIRECTIONS SIMUL, P17
[29]
DEADLOCK PREVENTION AND DEADLOCK-AVOIDANCE IN FLEXIBLE MANUFACTURING SYSTEMS USING PETRI NET MODELS
[J].
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION,
1990, 6 (06)
:713-723