A comparison between basic cyclic scheduling and variable cyclic scheduling in a two-stage hybrid flow shop

被引:10
作者
Tsubone, H
Suzuki, M
Uetake, T
Ohba, M
机构
[1] Tokyo Metropolitan Inst Technol, Hino, Tokyo 1910065, Japan
[2] Iwate Prefectual Univ, Takizawa, Iwate 0200173, Japan
[3] Konica Corp Ltd, Hino, Tokyo 1910065, Japan
关键词
lot sizing; operations and production management; repetitive manufacturing; and simulation;
D O I
10.1111/j.1540-5915.2000.tb00930.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper the impacts of two types of repetitive scheduling systems on the makespan in a two-stage hybrid flow shop, which consists of one machine in the first stage and multiple process lines in the second stage, are compared. First, we analyzed, through a simulation, how the makespan is affected by the setup frequency and sequencing rules for products under two types of scheduling systems: One is repetitive scheduling with only one batch per product family per scheduling cycle (basic cyclic scheduling system). The other is repetitive cyclic scheduling with various batches per product family per scheduling cycle (variable cyclic scheduling system). Second, we compared which scheduling system is superior under various manufacturing situations. The following points were noted. (1) The superior scheduling system can be shown by a two-dimensional diagram of the setup frequency and the imbalance in workload for processing among process lines in the second stage. (2) Variable cyclic scheduling is superior in comparison with basic cyclic scheduling when there is a large imbalance in the workload to be processed among process lines in the second stage, or the workload in the second stage is larger than that in the first stage. The result of this research provides guidelines for selecting which scheduling system should be adopted.
引用
收藏
页码:197 / 222
页数:26
相关论文
共 37 条
[1]   2 PARALLEL MACHINE SEQUENCING PROBLEMS INVOLVING CONTROLLABLE JOB PROCESSING TIMES [J].
ALIDAEE, B ;
AHMADIAN, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (03) :335-341
[2]  
Belarbi K., 1992, Production Planning and Control, V3, P36, DOI 10.1080/09537289208919371
[3]   FLOW-SHOP SCHEDULING IN SERIAL MULTIPRODUCT PROCESSES WITH TRANSFER AND SET-UP TIMES [J].
CAO, J ;
BEDWORTH, DD .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (08) :1819-1830
[4]  
Conway R.W., 1967, Theory of Scheduling
[5]  
DOBSON G, 1994, EUR J OPER RES, V77, P441
[6]   SCHEDULING SEQUENCE-DEPENDENT JOBS ON IDENTICAL PARALLEL MACHINES TO MINIMIZE COMPLETION-TIME CRITERIA [J].
GUINET, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (07) :1579-1594
[7]   Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time [J].
Guinet, AGP ;
Solomon, MM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (06) :1643-1654
[8]   SCHEDULES FOR A 2-STAGE HYBRID FLOWSHOP WITH PARALLEL MACHINES AT THE 2ND STAGE [J].
GUPTA, JND ;
TUNC, EA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (07) :1489-1502
[9]   2-STAGE, HYBRID FLOWSHOP SCHEDULING PROBLEM [J].
GUPTA, JND .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1988, 39 (04) :359-364
[10]   CYCLIC SCHEDULING FOR IMPROVEMENT [J].
HALL, RW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (03) :457-472