共 50 条
[23]
Study on the Decision of BOT Project Concession Period Based on a Fuzzy Comprehensive Evaluation
[J].
ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4,
2013, 357-360
:2299-2303
[26]
A Commanding Model of Counterwork Simulation System Based on Value Driving Decision-Making
[J].
ASIASIM 2012, PT I,
2012, 323
:13-+
[29]
The study of concession period for building operate transfer contract projects-based on reasonable interest of government
[J].
Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2,
2006,
:168-172
[30]
Application of EFQM-based Excellence Model in PPP Projects
[J].
ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4,
2012, 174-177
:2957-+