共 50 条
- [22] Study on the Decision of BOT Project Concession Period Based on a Fuzzy Comprehensive Evaluation ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2299 - 2303
- [25] A Commanding Model of Counterwork Simulation System Based on Value Driving Decision-Making ASIASIM 2012, PT I, 2012, 323 : 13 - +
- [28] The study of concession period for building operate transfer contract projects-based on reasonable interest of government Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 168 - 172
- [29] Application of EFQM-based Excellence Model in PPP Projects ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2957 - +