FAIRNESS PREFERENCE BASED DECISION-MAKING MODEL FOR CONCESSION PERIOD IN PPP PROJECTS

被引:10
作者
Yan, Xue [1 ]
Chong, Heap-Yih [2 ]
Zhou, Jing [1 ]
Sheng, Zhaohan [1 ]
Xu, Feng [1 ]
机构
[1] Nanjing Univ, Sch Management & Engn, 22 Hankou Rd, Nanjing 210093, Jiangsu, Peoples R China
[2] Curtin Univ, Sch Built Environm, Perth, WA 6102, Australia
基金
中国国家自然科学基金; 国家自然科学基金重大项目;
关键词
Concession period; fairness preference; Nash bargaining game; PPP projects; PRIVATE PARTNERSHIP PROJECTS; GAME-THEORY; NEGOTIATION;
D O I
10.3934/jimo.2018137
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Both government and private sector have the characteristic of fairness preference when deciding a suitable concession period for infrastructure projects. The appropriate concession period is helpful to construct the Public-Private-Partnership (PPP) project, to alleviate governments financial burden, and to boast the economic growth. Therefore, this paper aims to develop a decision-making model of concession period with fairness preference based on the two sides equitable utilities. To better describe decision makers fair psychology, the Nash bargaining game solution was adopted as a fair reference point. The results show that the concession period with fairness preference will become longer than that without fairness preference. Furthermore, the longer the concession period is, the better construction quality of the infrastructure project (highway) is. So, decision makers with fairness preference tend to make good decisions. In conclusion, the developed decision-making model renders useful references for both government and private sector in negotiating the concession period for infrastructure projects.
引用
收藏
页码:11 / 23
页数:13
相关论文
共 50 条
  • [1] Decision-making Model of Concession Price and Period for Traffic BOT Projects under Elastic Demand
    Song, Jinbo
    Wang, Xinbo
    Wang, Dongbo
    Dai, Dashuang
    2012 FIFTH INTERNATIONAL CONFERENCE ON BUSINESS INTELLIGENCE AND FINANCIAL ENGINEERING (BIFE), 2012, : 550 - 555
  • [2] The decision-making model of TOT concession period based on Utility Stochastic Petri Net
    Shen, Junxin
    Wang, Songjiang
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION ICMS2010, VOL 5: APPLIED MATHEMATICS AND MATHEMATICAL MODELLING, 2010, : 225 - 230
  • [3] Determination a Reasonable Concession Period for (PPP) Projects
    Hadi, Ali Hasan
    Erzaij, Kadhim Raheim
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (06): : 1235 - 1248
  • [4] A Concession Period and Price Determination Model for PPP Projects: Based on Real Options and Risk Allocation
    Ma, Guofeng
    Du, Qingjuan
    Wang, Kedi
    SUSTAINABILITY, 2018, 10 (03):
  • [5] Optimizing the concession period of PPP projects for fair allocation of financial risk
    Jin, Hongyu
    Liu, Shijing
    Liu, Chunlu
    Udawatta, Nilupa
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (10) : 2347 - 2363
  • [6] Strategic Interaction Between the Government and the Private Sector in PPP Projects Incorporating the Fairness Preference
    Han, Jiaojie
    Jia, Manzuo
    Wu, Guangdong
    Yang, Huilin
    IEEE ACCESS, 2020, 8 : 37621 - 37631
  • [7] System Dynamics Model to Determine Concession Period of PPP Infrastructure Projects: Overarching Effects of Critical Success Factors
    Ullah, Fahim
    Thaheem, Muhammad Jamaluddin
    Sepasgozar, Samad M. E.
    Forcada, Nuria
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2018, 10 (04)
  • [8] Pavement Maintenance-Focused Decision Analysis on Concession Periods of PPP Highway Projects
    Zhang, Hong
    Jin, Rui
    Li, Heng
    Skibniewski, Miroslaw J.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (01)
  • [9] Decision-making for supplying energy projects: A four-dimensional model
    Stegen, Karen Smith
    Palovic, Martin
    ENERGY CONVERSION AND MANAGEMENT, 2014, 86 : 644 - 652
  • [10] Inclusion of "managing flexibility" valuations in the pricing of PPP projects: a multi-objective decision-making method
    Guo, Yubo
    Su, Yangyang
    Chen, Chuan
    Martek, Igor
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4562 - 4584