Modified Harmony Search Algorithm for Resource-Constrained Parallel Machine Scheduling Problem with Release Dates and Sequence-Dependent Setup Times

被引:7
作者
Al-harkan, Ibrahim M. [1 ]
Qamhan, Ammar A. [1 ]
Badwelan, Ahmed [1 ]
Alsamhan, Ali [1 ]
Hidri, Lotfi [1 ]
机构
[1] King Saud Univ, Dept Ind Engn, Riyadh 11451, Saudi Arabia
关键词
harmony search; parallel machines; renewable resources; scheduling;
D O I
10.3390/pr9040654
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This research focuses on the problem of scheduling a set of jobs on unrelated parallel machines subject to release dates, sequence-dependent setup times, and additional renewable resource constraints. The objective is to minimize the maximum completion time (makespan). To optimize the problem, a modified harmony search (MHS) algorithm was proposed. The parameters of MHS are regulated using full factorial analysis. The MHS algorithm is examined, evaluated, and compared to the best methods known in the literature. Four algorithms were represented from similar works in the literature. A benchmark instance has been established to test the sensitivity and behavior of the problem parameters of the different algorithms. The computational results of the MHS algorithm were compared with those of other metaheuristics. The competitive performance of the developed algorithm is verified, and it was shown to provide a 42% better solution than the others.
引用
收藏
页数:19
相关论文
共 41 条
[1]   Heuristic and metaheuristic approaches for parallel machine scheduling under resource constraints [J].
Abdeljaoued, Mohamed Amine ;
Saadani, Nour El Houda ;
Bahroun, Zied .
OPERATIONAL RESEARCH, 2020, 20 (04) :2109-2132
[2]   Design of an efficient genetic algorithm for resource-constrained unrelated parallel machine scheduling problem with machine eligibility restrictions [J].
Afzalirad, Mojtaba ;
Shafipour, Masoud .
JOURNAL OF INTELLIGENT MANUFACTURING, 2018, 29 (02) :423-437
[3]   A realistic variant of bi-objective unrelated parallel machine scheduling problem: NSGA-II and MOACO approaches [J].
Afzalirad, Mojtaba ;
Rezaeian, Javad .
APPLIED SOFT COMPUTING, 2017, 50 :109-123
[4]   Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions [J].
Afzalirad, Mojtaba ;
Rezaeian, Javad .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 98 :40-52
[5]   Design of high-performing hybrid meta-heuristics for unrelated parallel machine scheduling with machine eligibility and precedence constraints [J].
Afzalirad, Mojtaba ;
Rezaeian, Javad .
ENGINEERING OPTIMIZATION, 2016, 48 (04) :706-726
[6]   Optimize Unrelated Parallel Machines Scheduling Problems With Multiple Limited Additional Resources, Sequence-Dependent Setup Times and Release Date Constraints [J].
Al-Harkan, Ibrahim M. ;
Qamhan, Ammar A. .
IEEE ACCESS, 2019, 7 :171533-171547
[7]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[8]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[9]   The third comprehensive survey on scheduling problems with setup times/costs [J].
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) :345-378
[10]   A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server [J].
Bektur, Gulcin ;
Sarac, Tugba .
COMPUTERS & OPERATIONS RESEARCH, 2019, 103 :46-63