Reliability-Centered Maintenance Scheduling Considering Failure Rates Uncertainty: A Two-Stage Robust Model

被引:23
|
作者
Alizadeh, Ali [1 ,2 ]
Fereidunian, Alireza [3 ]
Moghimi, Mojtaba [4 ,5 ]
Lesani, Hamid [2 ]
机构
[1] Laval Univ, Coll Sci & Technol, Dept ECE, Quebec City, PQ, Canada
[2] Univ Tehran, Coll Engn, Sch ECE, Tehran 113654563, Iran
[3] KN Toosi Univ Technol, Fac EE, Energy Smart Grid Lab, Tehran, Iran
[4] Griffith Univ, Sch Engn, Brisbane, Qld 4111, Australia
[5] Australian Energy Market Operator AEMO, Brisbane, Qld 4111, Australia
关键词
Maintenance engineering; Uncertainty; Power system reliability; Reliability; Stochastic processes; Mathematical model; Load modeling; Reliability-centered maintenance; failure rate uncertainty; robust optimization; RESILIENCE ENHANCEMENT; SYSTEM; OPTIMIZATION;
D O I
10.1109/TPWRD.2021.3101458
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Reliability-centered maintenance (RCM) as a subset of the reliability assessment problems, is a powerful tool for enhancing reliability, and subsequently achieving the customers' higher satisfaction. However, deterministic RCM models could scarcely guarantee global optimality and feasibility of their solutions with real-world uncertain failure rates. In this paper, a robust model is proposed to consider the impact of failure rate uncertainty in the RCM scheduling problem, followed by a two-stage robust model development. The two-stage robust model is solved using Benders decomposition (BD) and outer approximation (OA) algorithms. The proposed model and solution method are applied to both educational RBTS2 system and real-size Finnish Distribution System, followed by demonstration of a higher financial and reliability performance, compared to that of the deterministic model. Sensitivities of the costs, available budget, uncertainty interval and computational time are analyzed and discussed, to conclude the paper.
引用
收藏
页码:1941 / 1951
页数:11
相关论文
共 50 条
  • [21] Two-stage robust optimization for the integrated dynamic berth allocation and quay crane scheduling problem under uncertainty
    Ran, Lingyu
    Cheng, Yongxi
    Zhang, Guiqing
    ENGINEERING OPTIMIZATION, 2024,
  • [22] Two-stage distributionally robust optimization for joint system design and maintenance scheduling in high-consequence systems
    Zhang, Hanxiao
    Li, Yan-Fu
    Xie, Min
    Zhang, Chen
    IISE TRANSACTIONS, 2024, 56 (08) : 793 - 810
  • [23] A two-stage SCUC model for distribution networks considering uncertainty and demand response
    Wang, Fei
    Gan, Lei
    Zhang, Pengchao
    HELIYON, 2023, 9 (10)
  • [24] Using 0/1 mixed integer linear programming to solve a reliability-centered problem of power plant preventive maintenance scheduling
    Salvador Perez Canto
    Optimization and Engineering, 2011, 12 : 333 - 347
  • [25] A two-stage robust configuration optimization model and solution algorithm for new flexibility resources considering uncertainty response characterization
    Yang, Hailin
    Liu, Fei
    Yang, Hui
    Zhang, Xiangcheng
    Liu, Liantao
    FRONTIERS IN ENERGY RESEARCH, 2024, 12
  • [26] Two-Stage Robust Expansion Planning of Transmission Network Considering Uncertainty of Offshore Wind Power
    Tian, Shuxin
    Han, Xue
    Fu, Yang
    Su, Xiangjing
    Li, Zhenkun
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2024, 58 (09): : 1400 - 1409
  • [27] Two-stage robust optimization of thermal-ESS units scheduling under wind uncertainty
    Wang, Jun
    Xu, Xiao
    Li, Hongyan
    Chen, Hongmei
    ENERGY REPORTS, 2022, 8 : 1147 - 1155
  • [28] Inexact Two-Stage Stochastic Robust Optimization Model for Water Resources Management Under Uncertainty
    Xu, Ye
    Huang, Guohe
    Qin, Xiaosheng
    ENVIRONMENTAL ENGINEERING SCIENCE, 2009, 26 (12) : 1765 - 1776
  • [29] A Robust Two-Stage Model for the Urban Air Mobility Flight Scheduling Problem
    Portoleau, Tom
    D'Ambrosio, Claudia
    COMBINATORIAL OPTIMIZATION, ISCO 2024, 2024, 14594 : 348 - 360
  • [30] Weekly Two-Stage Robust Generation Scheduling for Hydrothermal Power Systems
    Dashti, Hossein
    Conejo, Antonio J.
    Jiang, Ruiwei
    Wang, Jianhui
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (06) : 4554 - 4564