A column generation-based heuristic for aircraft recovery problem with airport capacity constraints and maintenance flexibility

被引:82
作者
Liang, Zhe [1 ]
Xiao, Fan [1 ]
Qian, Xiongwen [1 ,2 ]
Zhou, Lei [1 ]
Jin, Xianfei [3 ]
Lu, Xuehua [3 ]
Karichery, Sureshan [3 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
[2] Nanyang Technol Univ, Sch Mech & Aerosp Engn, Singapore 639798, Singapore
[3] Sabre Airline Solut, 3150 Sabre Dr, Southlake, TX 76092 USA
基金
美国国家科学基金会;
关键词
Aircraft recovery problem; Disruptions management; Column generation; AIRLINE FLIGHT CANCELLATIONS; TIME DECISION-SUPPORT; SCHEDULE RECOVERY; HUB CLOSURES; ALGORITHM; DELAYS; PERTURBATION; INTEGRATION; OPERATIONS; MODELS;
D O I
10.1016/j.trb.2018.05.007
中图分类号
F [经济];
学科分类号
02 ;
摘要
We consider the aircraft recovery problem (ARP) with airport capacity constraints and maintenance flexibility. The problem is to re-schedule flights and re-assign aircraft in real time with minimized recovery cost for airlines after disruptions occur. In most published studies, airport capacity and flexible maintenance are not considered simultaneously via an optimization approach. To bridge this gap, we propose a column generation heuristic to solve the problem. The framework consists of a master problem for selecting routes for aircraft and subproblems for generating routes. Airport capacity is explicitly considered in the master problem and swappable planned maintenances can be incorporated in the subproblem. Instead of discrete delay models which are widely adopted in much of the existing literature, in this work flight delays are continuous and optimized accurately in the subproblems. The continuous-delay model can improve the accuracy of the optimized recovery cost by up to 37.74%. The computational study based on real-world problems shows that the master problem gives very tight linear relaxation with small, often zero, optimality gaps. Large-scale problems can be solved within 6 min and the run time can be further shortened by parallelizing subproblems on more powerful hardware. In addition, from a managerial point of view, computational experiments reveal that swapping planned maintenances may bring a considerable reduction in recovery cost by about 20% and 60%, depending on specific problem instances. Furthermore, the decreasing marginal value of airport slot quota is found by computational experiments. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:70 / 90
页数:21
相关论文
共 32 条
[1]   An integrated decision support tool for airlines schedule recovery during irregular operations [J].
Abdelghany, Khaled F. ;
Abdelghany, Ahmed F. ;
Ekollu, Goutham .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) :825-848
[2]  
Airlines for America, 2017, US PASS CARR DEL COS
[3]   The flight perturbation problem [J].
Andersson, T ;
Värbrand, P .
TRANSPORTATION PLANNING AND TECHNOLOGY, 2004, 27 (02) :91-117
[4]  
[Anonymous], 1963, DYNAMIC PROGRAMMING
[5]   A GRASP for aircraft routing in response to groundings and delays [J].
Arguello, MF ;
Bard, JF ;
Yu, G .
JOURNAL OF COMBINATORIAL OPTIMIZATION, 1997, 1 (03) :211-228
[6]   Flight string models for aircraft fleeting and routing [J].
Barnhart, C ;
Boland, NL ;
Clarke, LW ;
Johnson, EL ;
Nemhauser, GL ;
Shenoi, RG .
TRANSPORTATION SCIENCE, 1998, 32 (03) :208-220
[7]   A large neighbourhood search heuristic for the aircraft and passenger recovery problem [J].
Bisaillon, Serge ;
Cordeau, Jean-Francois ;
Laporte, Gilbert ;
Pasin, Federico .
4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2011, 9 (02) :139-157
[8]   Flight operations recovery: New approaches considering passenger recovery [J].
Bratu, S ;
Barnhart, C .
JOURNAL OF SCHEDULING, 2006, 9 (03) :279-298
[9]   Real-time decision support for integration of airline flight cancellations and delays .2. Algorithm and computational experiments [J].
Cao, JM ;
Kanafani, A .
TRANSPORTATION PLANNING AND TECHNOLOGY, 1997, 20 (03) :201-217
[10]   Real-time decision support for integration of airline flight cancellations and delays .1. Mathematical formulation [J].
Cao, JM ;
Kanafani, A .
TRANSPORTATION PLANNING AND TECHNOLOGY, 1997, 20 (03) :183-199