A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing

被引:23
作者
Ahmadov, Yashar [1 ]
Helo, Petri [1 ]
机构
[1] Univ Vaasa, Networked Value Syst, Dept Prod, POB 700, Vaasa 65101, Finland
关键词
Big data analytics; Sequence-dependent setup; Heuristics; Job scheduling; BIG DATA; CHANGEOVER TIMES; UP TIMES; SYSTEM;
D O I
10.1007/s10479-016-2304-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a prototype system of sheet metal processing machinery which collects production order data, passes current information to cloud based centralized job scheduling for setup time reduction and updates the production calendar accordingly. A centralized cloud service can collect and analyse production order data for machines and suggest optimized schedules. This paper explores the application of sequencing algorithms in the sheet metal forming industry, which faces sequence-dependent changeover times on single machine systems. We analyse the effectiveness of using such algorithms in the reduction of total setup times. We describe alternative models: Clustering, Nearest Neighbourhood and Travelling Salesman Problem, and then apply them to real data obtained from a manufacturing company, as well as to randomly generated data sets. Based on the prototype implementation clustering algorithm was proposed for actual implementation. Sequence-dependency increases the complexity of the scheduling problems; thus, effective approaches are required to solve them. The algorithms proposed in this paper provide efficient solutions to these types of sequencing problems.
引用
收藏
页码:5 / 24
页数:20
相关论文
共 31 条
  • [21] Papadimitriou C. H., 1977, Theoretical Computer Science, V4, P237, DOI 10.1016/0304-3975(77)90012-3
  • [22] Pinedo M.L., 2008, Scheduling: Theory, algorithms, and systems
  • [23] Porter ME, 2014, HARVARD BUS REV, V92, P64
  • [24] An integrated manufacturing information system for mass sheet metal cutting
    Rao, Yunqing
    Huang, Gang
    Li, Peigen
    Shao, Xinyu
    Yu, Daoyuan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 33 (5-6) : 436 - 448
  • [25] Scheduling problems with position dependent job processing times: computational complexity results
    Rudek, Radoslaw
    [J]. ANNALS OF OPERATIONS RESEARCH, 2012, 196 (01) : 491 - 516
  • [26] SETUP REDUCTION AND INCREASED EFFECTIVE CAPACITY
    SPENCE, AM
    PORTEUS, EL
    [J]. MANAGEMENT SCIENCE, 1987, 33 (10) : 1291 - 1301
  • [27] Editorial for the special issue on big data and cloud technology for manufacturing
    Tao, F.
    Zhang, L.
    Nee, A. Y. C.
    Pickl, Stefan Wolfgang
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 84 (1-4) : 1 - 3
  • [28] A 5.875-approximation for the Traveling Tournament Problem
    Westphal, Stephan
    Noparlik, Karl
    [J]. ANNALS OF OPERATIONS RESEARCH, 2014, 218 (01) : 347 - 360
  • [29] SEQUENCE DEPENDENT SET-UP TIMES AND JOB SEQUENCING
    WHITE, CH
    WILSON, RC
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1977, 15 (02) : 191 - 202
  • [30] Zandin KjellB., 2001, MAYNARDS IND ENG HDB