Procurement and Governance Choices for Collaborative Infrastructure Projects

被引:18
|
作者
Chen, Le [1 ]
Manley, Karen [1 ]
Lewis, Joanne [1 ]
Helfer, Fernanda [2 ]
Widen, Kristian [3 ]
机构
[1] Queensland Univ Technol, Fac Sci & Engn, Sch Civil Engn & Built Environm, Brisbane, Qld 4000, Australia
[2] Griffith Univ, Sch Engn, Nathan, Qld 4111, Australia
[3] Halmstad Univ, Sch Business Engn & Sci, S-30105 Halmstad, Sweden
基金
澳大利亚研究理事会;
关键词
Construction; Procurement; Infrastructure; Australia; Relational governance; Project alliance; Partnering; Integrated project delivery; Early contractor involvement; PERFORMANCE; MECHANISMS; INNOVATION;
D O I
10.1061/(ASCE)CO.1943-7862.0001525
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Collaborative approaches to infrastructure procurement are increasingly popular around the world due to their potential to provide improved project performance compared with more traditional approaches. The problem is that project outcomes continue to be unpredictable. Previous research has shown that this is the case regardless of whether the chosen procurement approach is based on price or nonprice selection of the project team. This is a major choice that clients make, but the presented research shows that governance choices for project execution are more important. This is significant because clients tend to focus more on procurement choices and typically do not differentiate governance based on those choices. This needs to change, and the authors show that optimal governance configurations vary on the basis of the chosen type of team configuration. For example, three specific governance arrangements for workshops are highlighted for single teams, and two specific governance arrangements for risk/reward sharing are highlighted for multiple teams. This study identifies governance actions that are associated with superior time and cost outcomes on collaborative infrastructure projects in Australia run by experienced public-sector clients under the two procurement scenarios. Based on a survey of 320 senior managers, independent sample t-tests were conducted to compare the application of governance actions among three distinct groups of projects, based on type of team selection and type of project outcome. The study provides evidence of the most effective approaches to project governance in a country that is a world leader. The results provide much needed recommendations for improved project performance based on large-scale quantitative analysis, which before now has not existed. Overall, the study recommends more attention be paid to noncontractual governance under both approaches to team selection, although the specific actions recommended vary.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Collaborative governance in Greek infrastructure projects
    Ojiako, Udechukwu
    Papadopoulos, Thanos
    Stamati, Teta
    Anagnostopoulos, Dimosthenis
    Marshall, Alasdair
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2015, 168 (03) : 135 - 145
  • [2] Collaborative procurement strategies for infrastructure projects: a multiple-case study
    Eriksson, Per Erik
    Volker, Leentje
    Kadefors, Anna
    Lingegard, Sofia
    Larsson, Johan
    Rosander, Lilly
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2019, 172 (05) : 197 - 205
  • [3] Validation of an Instrument to Measure Governance and Performance on Collaborative Infrastructure Projects
    Chen, Le
    Manley, Karen
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (05)
  • [4] Towards collaborative infrastructure procurement
    Spohr, Jonas
    Wikstrom, Kim
    Eriksson, Kent
    PUBLIC MONEY & MANAGEMENT, 2022, 42 (04) : 274 - 283
  • [5] Collaborative Learning to Improve the Governance and Performance of Infrastructure Projects in the Construction Sector
    Manley, Karen
    Chen, Le
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (05)
  • [6] Governance quality and public sector procurement of infrastructure projects in developing countries: evidence from Nigeria
    Asuquo, Christian
    Lashinde, Adeniran
    Adu, Emmanuel
    JOURNAL OF PUBLIC PROCUREMENT, 2021, 21 (03) : 285 - 299
  • [7] The interplay of governance mechanisms in complex procurement projects
    Caniels, Marjolein C. J.
    Gelderman, Cees J.
    Vermeulen, Nicole P.
    JOURNAL OF PURCHASING AND SUPPLY MANAGEMENT, 2012, 18 (02) : 113 - 121
  • [8] Governing public-private partnerships for sustainability An analysis of procurement and governance practices of PPP infrastructure projects
    Hueskes, Marlies
    Verhoest, Koen
    Block, Thomas
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (06) : 1184 - 1195
  • [9] Collaborative Evolutionary Model of the Hybrid Governance System of Public-Private Partnership Infrastructure Projects
    Ge, Zi-Han
    Zhang, Yun-Hua
    Zheng, Jun-Wei
    Wang, Ming-Qin
    Journal of Infrastructure Systems, 2025, 31 (02)
  • [10] Experience with Best Value Procurement in Norwegian Infrastructure Projects
    Joudi, Atosa
    Breivik, Ingrid Borset
    Wondimu, Paulos
    Houck, Leif Daniel
    CENTERIS 2018 - INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS / PROJMAN 2018 - INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT / HCIST 2018 - INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERI, 2018, 138 : 783 - 790