Economic lot-sizing problem with remanufacturing option: complexity and algorithms

被引:2
作者
Arulselvan, Ashwin [1 ]
Akartunali, Kerem [1 ]
van den Heuvel, Wilco [2 ]
机构
[1] Univ Strathclyde, Dept Management Sci, 199 Cathedral St, Glasgow G4 0QU, Lanark, Scotland
[2] Erasmus Univ, Erasmus Sch Econ, Econometr Inst, POB 1738, NL-3000 DR Rotterdam, Netherlands
关键词
Lot-sizing; Remanufacturing; Complexity; Polynomial algorithms;
D O I
10.1007/s11590-021-01768-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In a single item dynamic lot-sizing problem, we are given a time horizon and demand for a single item in every time period. The problem seeks a solution that determines how much to produce and carry at each time period, so that we will incur the least amount of production and inventory cost. When the remanufacturing option is included, the input comprises of number of returned products at each time period that can be potentially remanufactured to satisfy the demands, where remanufacturing and inventory costs are applicable. For this problem, we first show that it cannot have a fully polynomial time approximation scheme. We then provide a polynomial time algorithm, when we make certain realistic assumptions on the cost structure.
引用
收藏
页码:421 / 432
页数:12
相关论文
共 18 条
[1]   A dynamic uncapacitated lot-sizing problem with co-production [J].
Agrali, Semra .
OPTIMIZATION LETTERS, 2012, 6 (06) :1051-1061
[2]  
Ahuja Ravindra K, 1988, Network Flows
[3]   A computational analysis of lower bounds for big bucket production planning problems [J].
Akartunali, Kerem ;
Miller, Andrew J. .
COMPUTATIONAL OPTIMIZATION AND APPLICATIONS, 2012, 53 (03) :729-753
[4]   A theoretical and computational analysis of lot-sizing in remanufacturing with separate setups [J].
Ali, Sharifah Aishah Syed ;
Doostmohammadi, Mandi ;
Akartunali, Kerem ;
van der Meer, Robert .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2018, 203 :276-285
[5]   A computational comparison of formulations for the economic lot-sizing with remanufacturing [J].
Cunha, Jesus O. ;
Melo, Rafael A. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 92 :72-81
[6]   DETERMINISTIC PRODUCTION PLANNING WITH CONCAVE COSTS AND CAPACITY CONSTRAINTS [J].
FLORIAN, M ;
KLEIN, M .
MANAGEMENT SCIENCE SERIES A-THEORY, 1971, 18 (01) :12-20
[7]   DETERMINISTIC PRODUCTION PLANNING - ALGORITHMS AND COMPLEXITY [J].
FLORIAN, M ;
LENSTRA, JK ;
RINNOOYKAN, AHG .
MANAGEMENT SCIENCE, 1980, 26 (07) :669-679
[8]  
Garey M., 1979, Siam Rev.
[9]   Economic lot-sizing with remanufacturing options [J].
Golany, B ;
Yang, J ;
Yu, G .
IIE TRANSACTIONS, 2001, 33 (11) :995-1003
[10]   Economic lot-sizing with remanufacturing: complexity and efficient formulations [J].
Helmrich, Mathijn J. Retel ;
Jans, Raf ;
van den Heuvel, Wilco ;
Wagelmans, Albert P. M. .
IIE TRANSACTIONS, 2014, 46 (01) :67-86