Construction Planning and Scheduling of a Renovation Project Using BIM-Based Multi-Objective Genetic Algorithm

被引:28
作者
Nusen, Pornpote [1 ]
Boonyung, Wanarut [2 ]
Nusen, Sunita [3 ]
Panuwatwanich, Kriengsak [4 ]
Champrasert, Paskorn [2 ]
Kaewmoracharoen, Manop [2 ]
机构
[1] Chiang Mai Univ, Dept Civil Engn, Fac Engn, Chiang Mai 50200, Thailand
[2] Chiang Mai Univ, Optimizat Theory & Applicat Engn Syst Res Grp OAS, Chiang Mai 50200, Thailand
[3] Rajamangala Univ Technol Lanna, Dept Civil & Environm Engn, Fac Engn, Chiang Mai 50300, Thailand
[4] Thammasat Univ, Sirindhorn Int Inst Technol, Sch Civil Engn & Technol, Pathum Thani 12120, Thailand
来源
APPLIED SCIENCES-BASEL | 2021年 / 11卷 / 11期
关键词
renovation; planning; scheduling; building information modeling; multi-objective genetic algorithm; resource utilization; OPTIMIZATION; COST; DESIGN; MODEL;
D O I
10.3390/app11114716
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Featured Application Building information modeling with multi-objective genetic algorithm. Renovation is known to be a complicated type of construction project and prone to errors compared to new constructions. The need to carry out renovation work while keeping normal business activities running, coupled with strict governmental building renovation regulations, presents an important challenge affecting construction performance. Given the current availability of robust hardware and software, building information modeling (BIM) and optimization tools have become essential tools in improving construction planning, scheduling, and resource management. This study explored opportunities to develop a multi-objective genetic algorithm (MOGA) on existing BIM. The data were retrieved from a renovation project over the 2018-2020 period. Direct and indirect project costs, actual schedule, and resource usage were tracked and retrieved to create a BIM-based MOGA model. After 500 generations, optimal results were provided as a Pareto front with 70 combinations among total cost, time usage, and resource allocation. The BIM-MOGA can be used as an efficient tool for construction planning and scheduling using a combination of existing BIM along with MOGA into professional practices. This approach would help improve decision-making during the construction process based on the Pareto front data provided.
引用
收藏
页数:18
相关论文
共 54 条
[1]   Multi-objective genetic optimization for scheduling a multi-storey building [J].
Agrama, Fatma A. .
AUTOMATION IN CONSTRUCTION, 2014, 44 :119-128
[2]   BIM-based Applications of Metaheuristic Algorithms to Support the Decision-making Process: Uses in the Planning of Construction Site Layout [J].
Amiri, Roya ;
Sardroud, Javad Majrouhi ;
de Soto, Borja Garcia .
CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 :558-564
[3]  
Arayici Y., 2010, Construction and building: Design, materials, and techniques, 2010, P99
[4]  
Asl MR, 2014, FUSION: DATA INTEGRATION AT ITS BEST, VOL 2, P455
[5]  
Azhar S., 2011, Leadership and Management in Engineering, V11, P241, DOI DOI 10.1061/(ASCE)LM.1943-5630.0000127
[6]   Cloud-to-BIM-to-FEM: Structural simulation with accurate historic BIM from laser scans [J].
Barazzetti, Luigi ;
Banfi, Fabrizio ;
Brumana, Raffaella ;
Gusmeroli, Gaia ;
Previtali, Mattia ;
Schiantarelli, Giuseppe .
SIMULATION MODELLING PRACTICE AND THEORY, 2015, 57 :71-87
[7]  
Carbonari G., 2015, Building Information Modelling (BIM) in Design, Construction and Operations, V149, P395, DOI [10.2495/BIM150331, DOI 10.2495/BIM150331]
[8]  
Chan WT, 2000, IEEE C EVOL COMPUTAT, P1087, DOI 10.1109/CEC.2000.870768
[9]   Traditional Design versus BIM Based Design [J].
Czmoch, Ireneusz ;
Pekala, Adam .
XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 :210-215
[10]   A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling [J].
Dasovic, Borna ;
Galic, Mario ;
Klansek, Uros .
SUSTAINABILITY, 2020, 12 (08)