Optimal ordering policy for an inventory system with linearly increasing demand and allowable shortages under two levels trade credit financing

被引:27
作者
Giri, B. C. [1 ]
Sharma, S. [1 ]
机构
[1] Jadavpur Univ, Dept Math, Kolkata 700032, India
关键词
Inventory; Increasing demand; Partial trade credit; Shortages; PERMISSIBLE DELAY; EOQ MODEL; QUANTITY; RETAILERS; PAYMENTS;
D O I
10.1007/s12351-015-0184-y
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
To reduce default risk, a retailer may offer a partial down-stream trade credit to its credit-risk customers who should pay a portion of their purchasing costs at the time of receiving items as a collateral deposit, and then receive a permissible trade credit on the rest of the outstanding amount. To reflect this fact, we consider an inventory model with linear time dependent demand under two levels of trade credit and allowable shortages. Depending on the relationship between up-stream and down-stream trade credit periods, several cases are considered and the necessary and sufficient conditions are derived for finding the optimal solution. We also present a simple algorithm to determine the optimal solution. Numerical examples are provided to illustrate the solution procedure. Sensitivity analysis of important model-parameters is performed and some relevant managerial implications are discussed.
引用
收藏
页码:25 / 50
页数:26
相关论文
共 24 条
[1]   ORDERING POLICIES OF DETERIORATING ITEMS UNDER PERMISSIBLE DELAY IN PAYMENTS [J].
AGGARWAL, SP ;
JAGGI, CK .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (05) :658-662
[2]   Economic production quantity models for deteriorating items with up-stream full trade credit and down-stream partial trade credit [J].
Chen, Sheng-Chih ;
Teng, Jinn-Tsair ;
Skouri, Konstantina .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 155 :302-309
[3]  
DAVE U, 1985, J OPER RES SOC, V36, P1069, DOI 10.1057/jors.1985.186
[4]   An integrated inventory model for a deteriorating item with allowable shortages and credit linked wholesale price [J].
Giri, B. C. ;
Sharma, S. .
OPTIMIZATION LETTERS, 2015, 9 (06) :1149-1175
[6]   Optimal retailer's ordering policies in the EOQ model under trade credit financing [J].
Huang, YF .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (09) :1011-1015
[7]   An EOQ model under retailer partial trade credit policy in supply chain [J].
Huang, Yung-Fu ;
Hsu, Kuang-Hua .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (02) :655-664
[8]   An ordering policy for deteriorating items with allowable shortage and permissible delay in payment [J].
Jamal, AMM ;
Sarker, BR ;
Wang, S .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1997, 48 (08) :826-833
[9]   An inventory model with time dependent demand and shortages under trade credit policy [J].
Khanra, S. ;
Mandal, Buddhadev ;
Sarkar, Biswajit .
ECONOMIC MODELLING, 2013, 35 :349-355
[10]   An EOQ model for a deteriorating item with time dependent quadratic demand under permissible delay in payment [J].
Khanra, S. ;
Ghosh, S. K. ;
Chaudhuri, K. S. .
APPLIED MATHEMATICS AND COMPUTATION, 2011, 218 (01) :1-9