Feasibility and flexibility for a trigeneration system

被引:36
作者
Lai, Sau Man [1 ]
Hui, Chi Wai [1 ]
机构
[1] Hong Kong Univ Sci & Technol, Dept Chem & Biomol Engn, Hong Kong, Hong Kong, Peoples R China
关键词
Trigeneration design; Demand uncertainty; Flexibility; Feasibility; Periodic variations; OPTIMAL OPERATION; DESIGN; PLANTS; HEAT; INDEX; POWER;
D O I
10.1016/j.energy.2009.04.024
中图分类号
O414.1 [热力学];
学科分类号
摘要
Trigeneration system, which produces heat, cold and electricity simultaneously, is generally designed based on the nominal condition. However, the utility demands are seldom. fixed and they are usually changing in periodical manner with the climate and the human activities. These demand changes make the system design difficult. To ensure operability, the system should be feasible and flexible to tackle such demand variations. Over-sizing, thermal storage and. flexibility re-allocation can be used to improve a trigeneration system's feasibility and. flexibility. These techniques may enlarge the feasible operating region, change and shift the expected utility production demands and interchange between different generation capabilities according to the demand requirements. As a result, the process feasibility and. flexibility can be improved. With feasible operation ensured, process. flexibility can be considered under economic trade-offs. A. flexible design with reasonable investment and operating costs provides additional benefits to cater demand changes in the future. In this study, process. flexibility and feasibility characteristics are proposed and evaluated from a new perspective. These are demonstrated in the trigeneration system design with a pre-defined structure to handle periodical utility demand deviations in a commercial building complex. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1693 / 1704
页数:12
相关论文
共 30 条
[1]  
*AG NAT RES EN, 2006, EN JAP 2006 STAT POL
[2]   Risk analysis for CHP decision making within the conditions of an open electricity market [J].
Al-Mansour, Fouad ;
Kozuh, Mitja .
ENERGY, 2007, 32 (10) :1905-1916
[3]   A mixed integer programming model for optimal design of trigeneration in a hospital complex [J].
Arcuri, P. ;
Florio, G. ;
Fragiacomo, P. .
ENERGY, 2007, 32 (08) :1430-1447
[4]  
BERTOLODI P, 2007, ELECT CONSUMPTION EF
[5]   Matrix modelling of small-scale trigeneration systems and application to operational optimization [J].
Chicco, Gianfranco ;
Mancarella, Pierluigi .
ENERGY, 2009, 34 (03) :261-273
[6]  
*EN EFF OFF, 2008, HONG KONG EN END US
[7]  
*EN INF ADM, 2007, ANN EN REV 2007
[8]   Exploration of economical sizing of gas engine and thermal store for combined heat and power plants in the UK [J].
Fragaki, Aikaterini ;
Andersen, Anders N. ;
Toke, David .
ENERGY, 2008, 33 (11) :1659-1670
[9]   Optimal unit sizing of cogeneration systems in consideration of uncertain energy demands as continuous random variables [J].
Gamou, S ;
Yokoyama, R ;
Ito, K .
ENERGY CONVERSION AND MANAGEMENT, 2002, 43 (9-12) :1349-1361
[10]   OPTIMIZATION STRATEGIES FOR FLEXIBLE CHEMICAL PROCESSES [J].
GROSSMANN, IE ;
HALEMANE, KP ;
SWANEY, RE .
COMPUTERS & CHEMICAL ENGINEERING, 1983, 7 (04) :439-462