Day-Ahead Probabilistic Model for Scheduling the Operation of a Wind Pumped-Storage Hybrid Power Station: Overcoming Forecasting Errors to Ensure Reliability of Supply to the Grid

被引:8
作者
Jurasz, Jakub [1 ]
Kies, Alexander [2 ]
机构
[1] AGH Univ Sci & Technol, Dept Engn Managment, PL-30059 Krakow, Poland
[2] Goethe Univ Frankfurt, Frankfurt Inst Adv Studies, D-60438 Frankfurt, Germany
关键词
variable renewable energy sources; hybrid energy sources; scheduling; non-dispatchability; reliability; THERMAL COMFORT OPTIMIZATION; HYDRO STORAGE; RENEWABLE INTEGRATION; SYSTEM; DEMAND; SPEED; GENERATION; IMPACTS; PLANTS;
D O I
10.3390/su10061989
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Variable renewable energy sources (VRES), such as solarphotovoltaic (PV) and wind turbines (WT), are starting to play a significant role in several energy systems around the globe. To overcome the problem of their non-dispatchable and stochastic nature, several approaches have been proposed so far. This paper describes a novel mathematical model for scheduling the operation of a wind-powered pumped-storage hydroelectricity (PSH) hybrid for 25 to 48 h ahead. The model is based on mathematical programming and wind speed forecasts for the next 1 to 24 h, along with predicted upper reservoir occupancy for the 24th hour ahead. The results indicate that by coupling a 2-MW conventional wind turbine with a PSH of energy storing capacity equal to 54 MWh it is possible to significantly reduce the intraday energy generation coefficient of variation from 31% for pure wind turbine to 1.15% for a wind-powered PSH The scheduling errors calculated based on mean absolute percentage error (MAPE) are significantly smaller for such a coupling than those seen for wind generation forecasts, at 2.39% and 27%, respectively. This is even stronger emphasized by the fact that, those for wind generation were calculated for forecasts made for the next 1 to 24 h, while those for scheduled generation were calculated for forecasts made for the next 25 to 48 h. The results clearly show that the proposed scheduling approach ensures the high reliability of the WT-PSH energy source.
引用
收藏
页数:21
相关论文
共 40 条
[1]   Pumping station design for a pumped-storage wind-hydro power plant [J].
Anagnostopoulos, John S. ;
Papantonis, Dimitris E. .
ENERGY CONVERSION AND MANAGEMENT, 2007, 48 (11) :3009-3017
[2]  
[Anonymous], 13 INT C IND LOG
[3]   A hybrid wind power forecasting model based on data mining and wavelets analysis [J].
Azimi, R. ;
Ghofrani, M. ;
Ghayekhloo, M. .
ENERGY CONVERSION AND MANAGEMENT, 2016, 127 :208-225
[4]   Joint energy demand and thermal comfort optimization in photovoltaic-equipped interconnected microgrids [J].
Baldi, Simone ;
Karagevrekis, Athanasios ;
Michailidis, Iakovos T. ;
Kosmatopoulos, Elias B. .
ENERGY CONVERSION AND MANAGEMENT, 2015, 101 :352-363
[5]   A comparative study of a wind hydro hybrid system with water storage capacity: Conventional reservoir or pumped storage plant? [J].
Canales, Fausto A. ;
Beluco, Alexandre ;
Mendes, Carlos Andre B. .
JOURNAL OF ENERGY STORAGE, 2015, 4 :96-105
[6]   On the optimization of the daily operation of a wind-hydro power plant [J].
Castronuovo, ED ;
Lopes, JAP .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (03) :1599-1606
[7]   Wind power day-ahead prediction with cluster analysis of NWP [J].
Dong, Lei ;
Wang, Lijie ;
Khahro, Shahnawaz Farhan ;
Gao, Shuang ;
Liao, Xiaozhong .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2016, 60 :1206-1212
[8]   Wind power impacts and electricity storage - A time scale perspective [J].
Hedegaard, K. ;
Meibom, P. .
RENEWABLE ENERGY, 2012, 37 (01) :318-324
[9]   A model for optimal scheduling of hydro thermal systems including pumped-storage and wind power [J].
Helseth, Arild ;
Gjelsvik, Anders ;
Mo, Birger ;
Linnet, Ulfar .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2013, 7 (12) :1426-1434
[10]   Economic feasibility and optimisation of an energy storage system for Portland Wind Farm (Victoria, Australia) [J].
Hessami, Mir-Akbar ;
Bowly, David R. .
APPLIED ENERGY, 2011, 88 (08) :2755-2763