Train shunting with service scheduling in a high-speed railway depot

被引:7
|
作者
Xu, Xiaoming [1 ]
Dessouky, Maged M. [2 ]
机构
[1] Hefei Univ Technol, Sch Automot & Transportat Engn, Hefei 230009, Peoples R China
[2] Univ Southern Calif, Daniel J Epstein Dept Ind & Syst Engn, Los Angeles, CA 90089 USA
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Train shunting; Maintenance; Schedule; Time-space network; Lagrangian relaxation; ROUTING TRAINS; ROLLING STOCK; OPTIMIZATION; ALGORITHM; SEARCH; PICKUP; MODEL; TRAMS; UNITS;
D O I
10.1016/j.trc.2022.103819
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
At high-speed railways, trains cover services during the day and are required to undergo maintenance at depots each night. A low-quality train schedule in the depot may result in delays in the availability of trains during the day which influences the reliability of the train timetables. Accordingly, this study examines the problem of train shunting with service scheduling in a depot where daily maintenance, cleaning operation, and safety operational requirements are considered. To cope with this complex problem, we first construct a two-layer time-space network in which each layer can only be used by trains traveling in the same direction. We then formulate the considered problem as a minimum-cost multi-commodity network flow model with incompatible arc sets and operational constraints. To solve the network flow problem, we present a Lagrangian relaxation heuristic. Finally, several computational experiments with practical data based on the Hefei-Nan depot and randomly generated data on trains' arrival and departure times at the depot are conducted to confirm the effectiveness of our model and the efficiency of the proposed heuristics.
引用
收藏
页数:23
相关论文
共 50 条
  • [1] Train shunting with service scheduling in a high-speed railway depot
    Xu, Xiaoming
    Dessouky, Maged M.
    Transportation Research Part C: Emerging Technologies, 2022, 143
  • [2] Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot
    Shi, Jintang
    Li, Haodong
    Wang, Daoqi
    Vansteenwegen, Pieter
    IEEE ACCESS, 2024, 12 : 38615 - 38630
  • [3] Parallel optimization method of train scheduling and shunting at complex high-speed railway stations
    Zhong, Mingxuan
    Yue, Yixiang
    Zhou, Leishan
    Zhu, Jianping
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2024, 39 (05) : 731 - 755
  • [4] Scheduling Method for Integrated Plan of Train Operation and Shunting Operation in High-speed Railway Station
    Zhong M.-X.
    Yue Y.-X.
    Zhou L.-S.
    Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2021, 21 (03): : 176 - 186
  • [5] Synchronized Optimization for Service Scheduling, Train Parking and Routing at High-Speed Rail Maintenance Depot
    Wang, Jiaxi
    Zhao, Yinan
    Gronalt, Manfred
    Lin, Boliang
    Wu, Jianping
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2022, 23 (05) : 4525 - 4540
  • [6] Joint optimization of train platforming and shunting with service scheduling at a railway hub
    Shi, Jintang
    Li, Haodong
    Vansteenwegen, Pieter
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 197
  • [7] Aerodynamics of high-speed railway train
    Raghunathan, RS
    Kim, HD
    Setoguchi, T
    PROGRESS IN AEROSPACE SCIENCES, 2002, 38 (6-7) : 469 - 514
  • [8] Study on High-speed Railway Train Scheduling Based on Integration of Management and Control
    Gao, Mo
    Zhou, Leishan
    Zhou, Yu
    ADVANCES IN COMPUTERS, ELECTRONICS AND MECHATRONICS, 2014, 667 : 81 - 84
  • [9] Integrated optimization of train scheduling and maintenance planning on high-speed railway corridors
    Zhang, Chuntian
    Gao, Yuan
    Yang, Lixing
    Kumar, Uday
    Gao, Ziyou
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2019, 87 : 86 - 104
  • [10] An Integrated Model of Train Re-Scheduling and Control for High-Speed Railway
    Meng, Xuelei
    Wang, Yahui
    Lin, Li
    Li, Lei
    Jia, Limin
    SUSTAINABILITY, 2021, 13 (21)