Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model

被引:30
|
作者
Panwar, Abhilasha [1 ]
Jha, Kumar Neeraj [1 ]
机构
[1] Indian Inst Technol Delhi, Dept Civil Engn, Delhi 110016, India
关键词
Trade-off; Time; Cost; Coordinate plot; Many-objectives; Sensitivity analysis; MULTIOBJECTIVE EVOLUTIONARY ALGORITHMS; PARTICLE SWARM OPTIMIZATION; PROJECT-MANAGEMENT; DECISION-MAKING; DISCRETE-TIME;
D O I
10.1061/(ASCE)CO.1943-7862.0001979
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Quality and safety are important and are the leading concerns in a construction project. Planning a project without properly incorporating these two performance parameters propagates multifarious defects and accidents in construction projects and this ultimately leads to cost overrun and time delay. In order to deal with quality and safety at the planning stage (along with time and cost), a decision-making model considering time, cost, quality, and safety (TCQS) is developed on the basis of a many-objective evolutionary algorithm (nondominated sorting genetic algorithm III) and presented in this study. An example is illustrated to demonstrate the capabilities of the proposed model for generating and visualizing the optimal trade-off among TCQS. The proposed model shows better results compared to earlier reported scheduling models. Additionally, the study has also conducted a correlation analysis to identify the interrelationship, if any, among the TCQS components. Furthermore, the solution obtained from the model was put through sensitivity analysis. The developed model was also checked for two large-scale scheduling cases and found to work efficiently. The inclusion of objectives like quality and safety will provide a holistic scheduling model for the construction professionals. This study is expected to provide an alternative planning strategy and assist project managers in selecting optimal TCQS trade-offs while constructing a facility.
引用
收藏
页数:15
相关论文
共 50 条
  • [1] A crashing-based time-cost trade-off model considering quality cost and contract clauses
    Akin, Firat Dogu
    Polat, Gul
    Turkoglu, Harun
    Damci, Atilla
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 23 (06) : 954 - 963
  • [2] Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
    Yilmaz, Mehmet
    Dede, Tayfun
    STRUCTURES, 2023, 48 : 798 - 808
  • [3] Simplified Solution of Time-Cost Trade-off Problem for Building Constructions by Linear Scheduling
    Bettemir, Onder Halis
    Yucel, Tugay
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2023, 17 (02) : 293 - 309
  • [4] Time-cost trade-off problem in construction project management, based on fuzzy logic
    Abbasnia, R.
    Afshar, A.
    Eshtehardian, E.
    Journal of Applied Sciences, 2008, 8 (22) : 4159 - 4165
  • [5] MINLP optimization model for the nonlinear discrete time-cost trade-off problem
    Klansek, Uros
    Psunder, Mirko
    ADVANCES IN ENGINEERING SOFTWARE, 2012, 48 : 6 - 16
  • [6] A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction
    Fu, Fang
    Zhang, Tao
    PLOS ONE, 2016, 11 (12):
  • [7] Augmented Time-Cost Trade-Off Optimization Using Particle Swarm Optimization
    Turkoglu, Harun
    Arditi, David
    Polat, Gul
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (05)
  • [8] A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
    Wang, Peipei
    Wang, Kun
    Huang, Yunhan
    Fenn, Peter
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (11) : 4677 - 4695
  • [9] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Togan, Vedat
    Eirgash, M. Azim
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 10 - 20
  • [10] The time-cost trade-off problem and its extensions: A state-of-the-art survey and outlook
    Hosseinpour, Maedeh
    Roghanian, Emad
    Weber, Gerhard-Wilhelm
    JOURNAL OF PROJECT MANAGEMENT, 2023, 8 (03) : 141 - 164