A project-oriented production model of batch plants

被引:5
|
作者
Martinez, EC [1 ]
Perez, GA [1 ]
机构
[1] INGAR Inst Desarrollo & Diseno, RA-3000 Santa Fe, Argentina
关键词
batch process; process task network; decentralization;
D O I
10.1016/S0098-1354(97)00225-1
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a project-oriented framework for interactive analysis of the feasible plans and schedules that can provide an effective/efficient flow of orders within a batch process. The proposed approach is based on a hierarchical project-oriented production model that integrates production planning with short-term scheduling and resource leveling, At the highest layer of the hierarchy, the use of aggregate activities and their milestone dates is aimed to emphasize a management perspective of the production model. As a core element of the model a process task network is used. Each node of this network is expanded further into sub-tasks and their detailed schedules. Efficiency in resource's usage during short-term scheduling is improved by changing process task durations. The implementation of the project-oriented production planning methodology has been based on the existing literature in project management (Leachman, 1982, Leachman, 1983; Hackman and Leachman, 1989), but many alternative techniques can be used for specific layers (sub-problems) of the proposed hierarchy. An attractive feature of the project oriented approach is that descentralized decision making is favored. Conflicts between management objectives and shop-floor decisions are solved iteratively in a two-tier scheme. Simple examples are considered to illustrate the potentials and advantages of the project-oriented approach. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:391 / 414
页数:24
相关论文
共 50 条
  • [1] AN AGGREGATE MODEL OF PROJECT-ORIENTED PRODUCTION
    HACKMAN, ST
    LEACHMAN, RC
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1989, 19 (02): : 220 - 231
  • [2] Project-oriented management of batch plants.: Information system design
    Martínez, EC
    COMPUTERS & CHEMICAL ENGINEERING, 1999, 23 : S711 - S714
  • [3] On performance modeling of project-oriented production
    Martinez, EC
    Duje, D
    Perez, GA
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (03) : 509 - 527
  • [4] Tri-base model:: An approach to project-oriented production modelling
    Pechoucek, M
    Marík, V
    Stepánková, O
    Hazdra, T
    SIMULATION: PAST, PRESENT AND FUTURE, 1998, : 622 - 626
  • [5] Project-Oriented Leadership
    Shelley, Arthur
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2011, 4 (02) : 355 - U208
  • [6] A Hybrid Authorization Model For Project-Oriented Workflow
    张晓光
    High Technology Letters, 2003, (03) : 92 - 96
  • [7] Project-Oriented Leadership
    Gladden, Risto
    PROJECT MANAGEMENT JOURNAL, 2011, 42 (04) : 107 - 107
  • [8] Research of model of knowledge management of project-oriented enterprise
    Xu Congwei
    Gai Suxia
    Proceedings of 20th IPMA World Congress on Project Management, Vols 1 and 2, 2006, : 555 - 558
  • [9] Culture of Project-oriented Society
    Bockova, Katerina Hrazdilova
    Novotny, Jaroslav
    JOURNAL OF COMPETITIVENESS, 2010, (01) : 74 - 84
  • [10] Model Of Management Of Resources Production In 4P-Environment Of Project-Oriented Enterprise
    Yehorchenkova, Nataliia
    Teslia, Iurii
    Yehorchenkov, Oleksii
    Kubiavka, Liubov
    Latysheva, Tatiana
    Kataieva, Yevheniia
    Verenych, Olena
    PROCEEDINGS OF THE 2019 10TH IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT DATA ACQUISITION AND ADVANCED COMPUTING SYSTEMS - TECHNOLOGY AND APPLICATIONS (IDAACS), VOL. 2, 2019, : 997 - 1001