A systematic approach to the effective strategy and plan of stakeholders for safety improvement during decommissioning of nuclear facilities

被引:2
作者
Jeong, KwanSeong [1 ]
Choi, ManSoo [1 ]
Kim, Alexandr [1 ]
Lee, JungJun [2 ]
Lee, ByungSik [3 ]
机构
[1] Korea Atom Energy Res Inst, Daedeok Daero 989-111, Daejeon 34057, South Korea
[2] Korea Inst Nucl Safety, Gwahak Ro 34, Daejeon 34142, South Korea
[3] DanKook Univ, Dandae-ro119, Cheonan 31116, Chungnam, South Korea
基金
新加坡国家研究基金会;
关键词
Decommissioning; Nuclar facilities; Stakeholder engagement;
D O I
10.1016/j.anucene.2021.108307
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
This paper is intended to identify a large spectrum of possible stakeholders and important factors for safety improvement during decommissioning of nuclear facilities. The relevant stakeholders of decommissioning have been analyzed. The engagement process and methods of stakeholders have been reviewed. The critical success factors for effective stakeholder engagement during decommissioning of nuclear facilities have been discussed. (C) 2021 Elsevier Ltd. All rights reserved.
引用
收藏
页数:10
相关论文
empty
未找到相关数据