A Wear Rule and Cutter Life Prediction Model of a 20-in. TBM Cutter for Granite: A Case Study of a Water Conveyance Tunnel in China

被引:111
|
作者
Liu, Quansheng [1 ,2 ]
Liu, Jianping [1 ,3 ]
Pan, Yucong [1 ,3 ]
Zhang, Xiaoping [2 ]
Peng, Xingxin [1 ,3 ]
Gong, Qiuming [4 ]
Du, Lijie [5 ]
机构
[1] Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn, Wuhan, Peoples R China
[2] Wuhan Univ, Sch Civil Engn, Key Lab Safety Geotech & Struct Engn Hubei Prov, Wuhan, Peoples R China
[3] Univ Chinese Acad Sci, Beijing, Peoples R China
[4] Beijing Univ Technol, Minist Educ, Key Lab Urban Secur & Disaster Engn, Beijing, Peoples R China
[5] Shijiazhuang Tiedao Univ, Key Lab Struct Hlth Monitoring & Control Hebei Pr, Shijiazhuang, Peoples R China
关键词
Tunnel boring machine (TBM); 20-in. disc cutter; Wear rule; Intact rock parameters; Cutter life; Prediction model; CASE-HISTORY; ROCK; ABRASIVENESS;
D O I
10.1007/s00603-017-1176-4
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Disc cutter wear is one of the comprehensive results of the rock-machine interaction in tunnel boring machine (TBM) tunneling. The replacement of the disc cutter is a time-consuming and costly activity that can significantly reduce the TBM utilization (U) and advance rate (AR), and has a major effect on the total time and cost of TBM tunneling projects. Therefore, the importance of predicting the cutter life accurately can never be overemphasized. Most cutter wear prediction models are only suitable for 17-in. or smaller disc cutters. However, use of large-diameter disc cutters has been an irresistible trend for large-section hard rock TBMs. This study attempts to reveal the genuine wear rule of a 20-in. disc cutter and develop a new empirical model for predicting the cutter life in granite based on field data collected from a water conveyance tunnel constructed by the TBM tunneling method in China. The field data including the actual cutter wear and the geological parameters along the studied tunnel were compiled in a special database that was subjected to statistical analysis to reveal the genuine wear rule of a 20-in. disc cutter and develop the reasonable correlations between some common intact rock parameters and the disc cutter life. These equations were developed based on data from massive to very massive granite with a UCS range of 40-100 MPa, which can be applied for the assessment of the cutter life of a 20-in. disc cutter in similar hard rock projects with similar rock strengths and rock abrasivities.
引用
收藏
页码:1303 / 1320
页数:18
相关论文
共 50 条
  • [41] Prediction of TBM Advance Rate Considering Geotechnical and Operating Risks: An Example of the Lanzhou Long Water Conveyance Tunnel, China
    Yan, Changbin
    Wang, Hejian
    Yang, Fengwei
    Yao, Wenmin
    Yang, Jihua
    ROCK MECHANICS AND ROCK ENGINEERING, 2022, 55 (04) : 2509 - 2519
  • [42] Prediction of TBM Advance Rate Considering Geotechnical and Operating Risks: An Example of the Lanzhou Long Water Conveyance Tunnel, China
    Changbin Yan
    Hejian Wang
    Fengwei Yang
    Wenmin Yao
    Jihua Yang
    Rock Mechanics and Rock Engineering, 2022, 55 : 2509 - 2519
  • [43] TBM Cutter Wear Under High-Strength Surrounding Rock Conditions: A Case Study from the Second Phase of the Northern Xinjiang Water Supply Project
    Zhengliang Zhou
    Zhongsheng Tan
    Zonglin Li
    Dong Ma
    Lilong Zhang
    Rock Mechanics and Rock Engineering, 2021, 54 : 5023 - 5039
  • [44] TBM Cutter Wear Under High-Strength Surrounding Rock Conditions: A Case Study from the Second Phase of the Northern Xinjiang Water Supply Project
    Zhou, Zhengliang
    Tan, Zhongsheng
    Li, Zonglin
    Ma, Dong
    Zhang, Lilong
    ROCK MECHANICS AND ROCK ENGINEERING, 2021, 54 (09) : 5023 - 5039
  • [45] Developing new equations for TBM performance prediction in carbonate-argillaceous rocks: a case history of Nowsood water conveyance tunnel
    Hassanpour, J.
    Rostami, J.
    Khamehchiyan, M.
    Bruland, A.
    GEOMECHANICS AND GEOENGINEERING-AN INTERNATIONAL JOURNAL, 2009, 4 (04): : 287 - 297
  • [46] Studying the Effect of Tunnel Depth Variation on the Specific Energy of TBM, Case Study: Karaj-Tehran (Iran) Water Conveyance Tunnel
    Mirahmadi, Majid
    Tabaei, Morteza
    Dehkordi, Mohsen Soleiman
    JOURNAL OF ENGINEERING AND TECHNOLOGICAL SCIENCES, 2016, 48 (04): : 408 - 416
  • [47] Application of TBM operational parameters to estimate the drop modulus, case study: Karaj–Tehran water conveyance tunnel of Iran
    Lazemi H.A.
    Dehkordi M.S.
    International Journal of Geo-Engineering, 7 (1)
  • [48] TBM performance analysis in very strong and massive rocks; case study: Kerman water conveyance tunnel project, Iran
    Pourhashemi, Seyed Mahdi
    Ahangari, Kaveh
    Hassanpour, Jafar
    Eftekhari, Seyed Mosleh
    GEOMECHANICS AND GEOENGINEERING-AN INTERNATIONAL JOURNAL, 2022, 17 (04): : 1110 - 1122
  • [49] In-situ methods for the TBM dismantling in a long-distance and deep-buried tunnel: Case study of Xinjiang water conveyance tunnel
    Xie, Wei-Qiang
    Li, Wei-Wei
    Liu, Xiao-Li
    Tang, Shao-Hui
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 129
  • [50] Estimation of the TBM penetration rate using the post-failure behavior of a rock mass and the equivalent thrust per cutter. A case study: the Amirkabir Water Transferring Tunnel of Iran
    H. A. Lazemi
    M. Soleiman Dehkordi
    Bulletin of Engineering Geology and the Environment, 2019, 78 : 1735 - 1746