Automotive Body Shop Design Problems Using Meta-Models Considering Product-Mix Change and Reconfiguration Strategy

被引:0
作者
Moon, Dug Hee [1 ]
Kim, Dong Ok [2 ]
Shin, Yang Woo [3 ]
机构
[1] Changwon Natl Univ, Dept Ind & Syst Engn, Chang Won 51140, South Korea
[2] Changwon Natl Univ, Dept Ecofriendly Marine Plant FEED Engn, Chang Won 51140, South Korea
[3] Changwon Natl Univ, Dept Stat, Chang Won 51140, South Korea
来源
APPLIED SCIENCES-BASEL | 2021年 / 11卷 / 06期
基金
新加坡国家研究基金会;
关键词
manufacturing system design; automotive body shop; product-mix; reconfiguration; meta-model; simulation; BUFFER ALLOCATION; ASSEMBLY SYSTEM; PRODUCTION LINE; SIMULATION; OPTIMIZATION; REGRESSION; CLASSIFICATION;
D O I
10.3390/app11062748
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The estimation of production rate (or throughput) is important in manufacturing system design. Herein, we consider the manufacturing system of an automotive body shop in which two types of car are produced, and one car (engine car) is substituted by the other car (electric car) gradually. In this body shop, two different underbody lines are installed because the underbody structures of the two types of cars differ completely; however, the side body line and main body line are shared by the two cars. Furthermore, we assume that the underbody lines are reconfigurable based on an increase in the product mix of the electric car. A simulation-based meta-model, which is in the form of a quadratic polynomial function, is developed to estimate the production rate. In the meta-modelling process, we group some buffer locations and represent them as one variable to reduce the number of variables included in the meta-model. Subsequently, the meta-models have been used to optimize two types of buffer allocation problems, and optimal solutions are obtained easily.
引用
收藏
页数:19
相关论文
共 52 条
  • [1] Altiok T., 1997, PERFORMANCE ANAL MAN
  • [2] Buffer allocation in unreliable production lines based on design of experiments, simulation, and genetic algorithm
    Amiri, Maghsoud
    Mohtashami, Ali
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 62 (1-4) : 371 - 383
  • [3] Sequencing procedure for balancing the workloads variations in case of mixed model assembly system with multiple secondary feeder lines
    Azzi, Anna
    Battini, Daria
    Faccio, Maurizio
    Persona, Alessandro
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (21) : 6081 - 6098
  • [4] Mixed model assembly system with multiple secondary feeder lines: layout design and balancing procedure for ATO environment
    Azzi, Anna
    Battini, Daria
    Faccio, Maurizio
    Persona, Alessandro
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) : 5132 - 5151
  • [5] Response surface methodology (RSM) as a tool for optimization in analytical chemistry
    Bezerra, Marcos Almeida
    Santelli, Ricardo Erthal
    Oliveira, Eliane Padua
    Villar, Leonardo Silveira
    Escaleira, Luciane Amlia
    [J]. TALANTA, 2008, 76 (05) : 965 - 977
  • [6] Reconfigurable manufacturing systems: Literature review and research trend
    Bortolini, Marco
    Galizia, Francesco Gabriele
    Mora, Cristina
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2018, 49 : 93 - 106
  • [7] Comparison of experimental designs for simulation-based symbolic regression of manufacturing systems
    Can, Birkan
    Heavey, Cathal
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (03) : 447 - 462
  • [8] Electrification in the automotive industry: effects in remanufacturing
    Casper R.
    Sundin E.
    [J]. Journal of Remanufacturing, 2021, 11 (2) : 121 - 136
  • [9] Comparative evaluations of buffer allocation strategies in a serial production line
    Chan, FTS
    Ng, EYH
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2002, 19 (11) : 789 - 800
  • [10] Design and management of digital manufacturing and assembly systems in the Industry 4.0 era
    Cohen, Yuval
    Faccio, Maurizio
    Pilati, Francesco
    Yao, Xifan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 105 (09) : 3565 - 3577