Geological modelling, the observational method and management of ground hazards: Ramsgate Harbour Approach Road Tunnel

被引:5
|
作者
Newman, TG [1 ]
Allen, RG
Mortimore, RN
机构
[1] Thames Water Util Ltd, Geotech Grp, Ashford Common AWTW, Ashford TW15 1RU, Middx, England
[2] London Bridge Associates, Surrey KT6 6QH, England
[3] Univ Brighton, Sch Environm, Brighton BN2 4GJ, E Sussex, England
关键词
chalk; geological hazards; geological models; tunnels; observational methods;
D O I
10.1144/1470-9236/01041
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The Ramsgate Harbour Approach Road Tunnel (RHART) was the first to use the prevaulting tunnelling method in the UK. As with other forms of open-face tunnelling, this method relies on the establishment of a reliable pre-construction geological model and continual verification of this model during construction by use of the observational method. The route was thought to pass through difficult ground conditions containing a number of natural and artificial hazards which, if not managed properly, would have serious implications for health and safety during construction. This paper illustrates how geological modelling was used for early identification and prediction of such hazards, enabling the planning of contingency procedures. By incorporating the observational method in the construction process the site team was able to assess the accuracy of predictions made from the ground model. Procedures adopted during construction of the Ramsgate Harbour Approach Road Tunnel illustrate how results from continuous in-tunnel and surface observation and monitoring lead to increased confidence in the geological model and the prediction of ground behaviour. Adoption of these procedures reduced the risks posed from unforeseen ground hazards and significantly improved health and safety issues for personnel during construction.
引用
收藏
页码:35 / 50
页数:16
相关论文
共 21 条
  • [1] Ground investigations for Ramsgate Harbour Approach Road Tunnel - planning, procurement, evaluation and interpretation
    Huntley, SL
    Holtriger, M
    Jewell, PJ
    Macklin, SR
    TUNNELLING '97, 1997, : 185 - 210
  • [2] Forward modelling and imaging of ground-penetrating radar in tunnel ahead geological prospecting
    Liu, Bin
    Zhang, Fengkai
    Li, Shucai
    Li, Yao
    Xu, Shan
    Nie, Lichao
    Zhang, Chongmin
    Zhang, Qingsong
    GEOPHYSICAL PROSPECTING, 2018, 66 (04) : 784 - 797
  • [3] RESEARCH OF GEOLOGICAL HAZARDS COMPREHENSIVE ASSESSMENT IN KARST TUNNEL BASED ON FUZZY EVALUATION METHOD
    Kuang, Xing
    Bai, Mingzhou
    Wang, Chengliang
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 684 - 687
  • [4] Research of observational method on the groundwater in the tunnel approach crossing
    Ohnishi, Y
    Ohtsu, H
    Ishihara, H
    Okamoto, N
    Yasuda, T
    Takahashi, K
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 425 - 431
  • [5] Assessing Subaquatic Mass Movement Hazards: an Integrated Observational and Hydrodynamic Modelling Approach
    Love Råman Vinnå
    Damien Bouffard
    Alfred Wüest
    Stéphanie Girardclos
    Nathalie Dubois
    Water Resources Management, 2020, 34 : 4133 - 4146
  • [6] Assessing Subaquatic Mass Movement Hazards: an Integrated Observational and Hydrodynamic Modelling Approach
    Raman Vinna, Love
    Bouffard, Damien
    Wueest, Alfred
    Girardclos, Stephanie
    Dubois, Nathalie
    WATER RESOURCES MANAGEMENT, 2020, 34 (13) : 4133 - 4146
  • [7] Advanced Geological Prediction Investigation Based on the Ground Penetrating Radar Method in Qiyueshan Tunnel
    Guo, Ming
    Wu, Jing
    Xu, Zhenhao
    Li, Shucai
    Li, Liping
    Zhou, Lun
    Zhang, Yanhuan
    Chen, Hongbin
    ARCHITECTURAL ENGINEERING AND NEW MATERIALS, 2015, : 526 - 532
  • [9] Observational method as risk management tool: the Hvalfjorour tunnel project, Iceland
    Tidlund, Mats
    Spross, Johan
    Larsson, Stefan
    GEORISK-ASSESSMENT AND MANAGEMENT OF RISK FOR ENGINEERED SYSTEMS AND GEOHAZARDS, 2023, 17 (02) : 346 - 360
  • [10] Application of CSAMT monitoring method and observational construction management to mountain tunnel
    Fukui, T
    Hirai, T
    Morioka, T
    Suga, A
    Matsui, T
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 219 - 224