A heuristic for a batch processing machine scheduled to minimise total completion time with non-identical job sizes

被引:26
作者
Chang, PC
Wang, HM
机构
[1] Yuan Ze Univ, Dept Ind Engn & Management, Tao Yuan 32026, Taiwan
[2] Van Nung Inst Technol, Dept Ind Management, Tao Yuan 320, Taiwan
关键词
batch processing machine (BPM); scheduling; total completion time;
D O I
10.1007/s00170-003-1740-9
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper studies the problem of scheduling semiconductor burn-in operations, where each job has non-identical lot sizes and an oven (a batch processing machine) that processes several jobs within its capacity limit simultaneously. We present some properties of the problem and an efficient heuristic algorithm. In a computational experiment, pairs of burning operations (alpha,beta) were presented with the arrival time r(i) and processing time p(i) for different (alpha,beta) pairs to examine the effect of arrival time and the processing time on minimising the total completion time. The result shows that a ratio of alpha to beta greater than 1 was superior to other ratios, which can be a guide for schedule planners of burn-in operations. The heuristic obtains a satisfactory average performance rapidly.
引用
收藏
页码:615 / 620
页数:6
相关论文
共 18 条
[11]   EFFICIENT SCHEDULING ALGORITHMS FOR A SINGLE BATCH PROCESSING MACHINE [J].
IKURA, Y ;
GIMPLE, M .
OPERATIONS RESEARCH LETTERS, 1986, 5 (02) :61-65
[12]   EFFICIENT ALGORITHMS FOR SCHEDULING SEMICONDUCTOR BURN-IN OPERATIONS [J].
LEE, CY ;
UZSOY, R ;
MARTINVEGA, LA .
OPERATIONS RESEARCH, 1992, 40 (04) :764-775
[13]   A comparison of the effect of clozapine with typical neuroleptics on cognitive function in neuroleptic-responsive schizophrenia [J].
Lee, MA ;
Jayathilake, K ;
Meltzer, HY .
SCHIZOPHRENIA RESEARCH, 1999, 37 (01) :1-11
[14]   Scheduling with agreeable release times and due dates on a batch processing machine [J].
Li, CL ;
Lee, CY .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 96 (03) :564-569
[15]   Earliness and tardiness scheduling problems on a batch processor [J].
Qi, XT ;
Tu, FS .
DISCRETE APPLIED MATHEMATICS, 1999, 98 (1-2) :131-145
[16]   Minimizing makespan on a single burn-in oven with job families and dynamic job arrivals [J].
Sung, CS ;
Choung, YI ;
Hong, JM ;
Kim, YH .
COMPUTERS & OPERATIONS RESEARCH, 2002, 29 (08) :995-1007
[17]   Minimizing makespan on a single burn-in oven in semiconductor manufacturing [J].
Sung, CS ;
Choung, YI .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 120 (03) :559-574