An integrated production-inventory model with defective item dependent stochastic credit period

被引:27
作者
Das, Bibhas Chandra [1 ]
Das, Barun [2 ]
Mondal, Shyamal Kumar [1 ]
机构
[1] Vidyasagar Univ, Dept Appl Math Oceanol & Comp Programming, Midnapore 721102, India
[2] Jhargram Raj Coll, Dept Math, Midnapore 721507, India
关键词
Inventory; Supply chain management; Stochastic credit period; Defective ratio; Stochastic lead-time demand; CONTROLLABLE LEAD TIME; SERVICE LEVEL CONSTRAINT; ECONOMIC-LOT-SIZE; SUPPLY CHAIN MODEL; PERMISSIBLE DELAY; COST REDUCTION; TRADE CREDIT; VENDOR; SYSTEM; POLICY;
D O I
10.1016/j.cie.2017.05.025
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper an integrated production-inventory model has been developed for a defective item in a business of a buyer and a manufacturer. After production the manufacturer sells the packed products of the item to the buyer in some lots and then the buyer sells these products to the customer after checking them. There have chances to get the defectiveness of the products. So in this paper, it has been considered that the defective ratio of the item is random to be assumed as follows a beta distribution of first type. To compensate the losses due to defectiveness, the manufacturer offers a defective ratio dependent stochastic credit period to the buyer. Here also the lead time demand has been considered as a normal distribution and the lead time is composed of the cycle period and fixed delay time due to machinery set-up, waiting, transportation, etc. The integrated profit functions have been formulated for three cases which are illustrated numerically and solved by some proposed solution procedures. Finally a sensitivity analysis has been carried out with respect to some parameters. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:255 / 263
页数:9
相关论文
共 37 条
[31]   Channel coordination, trade credit and quantity discounts for freight cost [J].
Sheen, Gwo-Ji ;
Tsao, Yu-Chung .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2007, 43 (02) :112-128
[32]   The economic lot size of the integrated vendor-buyer inventory system derived without derivatives: A simple derivation [J].
Teng, Jinn-Tsair ;
Eduardo Cardenas-Barron, Leopoldo ;
Lou, Kuo-Ren .
APPLIED MATHEMATICS AND COMPUTATION, 2011, 217 (12) :5972-5977
[33]   Optimal inventory model for items with imperfect quality and shortage backordering [J].
Wee, H. M. ;
Yu, Jonas ;
Chen, M. C. .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (01) :7-11
[34]   A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives [J].
Wee, Hui Ming ;
Chung, Chun Jen .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 177 (02) :1289-1293
[35]   An optimal replenishment policy for non-instantaneous deteriorating items with stock-dependent demand and partial backlogging [J].
Wu, KS ;
Ouyang, LY ;
Yang, CT .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 101 (02) :369-384
[36]   A collaborative inventory system with permissible delay in payment for deteriorating items [J].
Yang, PC ;
Wee, HM .
MATHEMATICAL AND COMPUTER MODELLING, 2006, 43 (3-4) :209-221
[37]   A deteriorating repairable system with stochastic lead time and replaceable repair facility [J].
Yu, Miaomiao ;
Tang, Yinghui ;
Fu, Yonghong ;
Pan, Lemeng ;
Tang, Xiaowo .
COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (02) :609-615