COMMISSIONING HIGH PERFORMANCE BUILDINGS

被引:0
作者
Enck, Jay [1 ]
机构
[1] Commissioning & Green Bldg Solut Inc CxGBS, Buford, GA USA
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
The development of sustainable, healthy, high performance building requires monitoring and evaluating the design, construction, and operation of the facility. Owners should engage the commissioning authority before contracting with a design professional in the predesign phase. A commissioning authority (CxA) needs the owner's project requirements (OPR) and the design teams' basis of design (BOD) that forms the foundation for the design, construction, and occupancy and operation of the facility, and is the basis for commissioning. The size and complexity of a facility influences the number of commissioning designs reviews, which enables to implement the changes in concepts and addition or reductions of requirements within the project's budget and schedule. The trained and well managed operators, and continuous measurement and analysis of building performance are required to achieve a high performing building. The CxA focuses on optimizing building performance and occupant satisfaction and also monitors system of the building.
引用
收藏
页码:12 / +
页数:5
相关论文
共 50 条
[31]   High-performance steel structures for buildings [J].
Li, G. Q. ;
Jin, H. J. ;
Wang, H. J. ;
Pang, M. D. .
SUSTAINABLE BUILDINGS AND STRUCTURES, 2016, :3-11
[32]   Recent Developments on High Performance Steel for Buildings [J].
Shi, Yongjiu .
ADVANCES IN STRUCTURAL ENGINEERING, 2012, 15 (09) :1617-1622
[33]   Pandemic control in high-performance buildings [J].
Amlani, Tariq ;
Sádaba, Sergio .
Consulting-Specifying Engineer, 2020, 57 (07) :24-31
[34]   Contrasting Definitions of High Energy Performance Buildings [J].
Verhaeghe, Charlotte ;
Amaryllis, Audenaert ;
Verbeke, Stijn .
12TH NORDIC SYMPOSIUM ON BUILDING PHYSICS (NSB 2020), 2020, 172
[35]   Integration, interoperability in high-performance buildings [J].
Hawkinson, George ;
Morris, Matt ;
McMains, Jarrod .
Consulting-Specifying Engineer, 2020, 57 (08) :44-51
[36]   DESIGNING AND COMMISSIONING LIFE SAFETY SMOKE CONTROL-SYSTEM IN 2 HIGH-RISE BUILDINGS [J].
GRANEK, G .
ASHRAE JOURNAL-AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR-CONDITIONING ENGINEERS, 1976, 18 (12) :35-35
[37]   Development and Application of High Strength and High Performance Steel in Buildings [J].
Shi Yongjiu .
3RD INTERNATIONAL FORUM ON ADVANCES IN STRUCTURAL ENGINEERING: ADVANCES IN RESEARCH AND PRACTICE OF STEEL STRUCTURES, 2009, :397-407
[38]   Continuous commissioning of buildings: A case study of a campus building in Denmark [J].
Markoska, Elena ;
Jradi, Muhyiddine ;
Jorgensen, Bo Norregaard .
2016 IEEE INTERNATIONAL CONFERENCE ON INTERNET OF THINGS (ITHINGS) AND IEEE GREEN COMPUTING AND COMMUNICATIONS (GREENCOM) AND IEEE CYBER, PHYSICAL AND SOCIAL COMPUTING (CPSCOM) AND IEEE SMART DATA (SMARTDATA), 2016, :584-589
[39]   The CUORE cryostat: commissioning and performance [J].
Singh, V. ;
Alduino, C. ;
Alessandria, F. ;
Bersani, A. ;
Biassoni, M. ;
Bucci, C. ;
Caminata, A. ;
Canonica, L. ;
Cappelli, L. ;
Cereseto, R. ;
Chott, N. ;
Copello, S. ;
Cremonesi, O. ;
Cushman, J. S. ;
D'Addabbo, A. ;
Davis, C. J. ;
Dell'Oro, S. ;
Drobizhev, A. ;
Franceschi, M. A. ;
Gladstone, L. ;
Gorla, P. ;
Guetti, M. ;
Ligi, C. ;
Napolitano, T. ;
Nucciotti, A. ;
Orlandi, D. ;
Ouellet, J. L. ;
Pagliarone, C. E. ;
Pattavina, L. ;
Rusconi, C. ;
Santone, D. ;
Taffarello, L. ;
Terranova, F. ;
Wallig, J. ;
Wise, T. ;
Uttaro, S. .
XIV INTERNATIONAL CONFERENCE ON TOPICS IN ASTROPARTICLE AND UNDERGROUND PHYSICS (TAUP 2015), PTS 1-7, 2016, 718
[40]   Deliver smart buildings using CSI Division 25, commissioning [J].
Howe, Timothy ;
Myers, Marcus ;
Pickett, Jeri .
Consulting-Specifying Engineer, 2021, 58 (08) :36-41