Linking BIM to Power BI and HoloLens 2 to Support Facility Management: A Case Study Approach

被引:5
作者
Harode, Ashit [1 ]
Ensafi, Mahnaz [1 ]
Thabet, Walid [1 ]
机构
[1] Virginia Tech, Dept Bldg Construct, Blacksburg, VA 24061 USA
关键词
Building Information Modeling (BIM); facility management; systems-centric; Power BI; mixed reality; HoloLens; life-cycle data; FRAMEWORK;
D O I
10.3390/buildings12060852
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Facility lifecycle data captured in BIM during design and construction are very valuable for effective facility operations and maintenance. Traditionally, model authoring and analysis tools have been used to search and query model information. These tools are not well designed to search and display needed data and they require a steep learning curve. In this paper, the authors propose the use of Power BI dashboards to facilitate easy access and display of lifecycle data embedded in the model. The implementation and use of dashboards for facility management are discussed using a case study. The effectiveness and usability of the dashboards are validated using a focus group of six industry experts that were first interviewed then asked to complete a questionnaire. Feedback from interviews indicated that customized dashboards are effective tools to view, analyze and draw insights on data from various sources and can improve facility operations and management. Numerical results from the PSSUQ using fourteen questions indicated positive responses overall with an average score of four or five from the majority of respondents. Finally, the authors tested integration of the Power BI dashboards with the HoloLens 2 to deliver relevant up-to-date facility lifecycle data in near real-time to field staff.
引用
收藏
页数:25
相关论文
共 36 条
[1]   Automated checking of building component accessibility for maintenance [J].
Akanmu, Abiola A. ;
Olayiwola, Johnson ;
Olatunji, Oluwole Alfred .
AUTOMATION IN CONSTRUCTION, 2020, 114
[2]  
Ali SM, 2016, PROCEEDINGS OF THE 2016 2ND INTERNATIONAL CONFERENCE ON CONTEMPORARY COMPUTING AND INFORMATICS (IC3I), P656, DOI 10.1109/IC3I.2016.7918044
[3]  
[Anonymous], FIX YOUR MAINTENANCE
[4]  
Ashtab M., 2018, International Journal of Engineering and Technology, V10, P329, DOI 10.7763/IJET.2018.V10.1079
[5]   Application Areas and Data Requirements for BIM-Enabled Facilities Management [J].
Becerik-Gerber, Burcin ;
Jazizadeh, Farrokh ;
Li, Nan ;
Calis, Gulben .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (03) :431-442
[6]  
Blogic, VCAD IS SOL CRE BEAU
[7]   BIM-Based Energy Analysis and Sustainability Assessment-Application to Portuguese Buildings [J].
Carvalho, Jose Pedro ;
Almeida, Manuela ;
Braganca, Luis ;
Mateus, Ricardo .
BUILDINGS, 2021, 11 (06)
[8]   BIM-based framework for automatic scheduling of facility maintenance work orders [J].
Chen, Weiwei ;
Chen, Keyu ;
Cheng, Jack C. P. ;
Wang, Qian ;
Gan, Vincent J. L. .
AUTOMATION IN CONSTRUCTION, 2018, 91 :15-30
[9]   Smart Facility Management System Based on Open BIM and Augmented Reality Technology [J].
Chung, Suwan ;
Cho, Chung-Suk ;
Song, Jinwoo ;
Lee, Kyuhyup ;
Lee, Seojoon ;
Kwon, Soonwook .
APPLIED SCIENCES-BASEL, 2021, 11 (21)
[10]  
Danczyk J., 2017, P 2017 IEEE C COGNIT, P1, DOI [10.1109/COGSIMA.2017.7929600, DOI 10.1109/COGSIMA.2017.7929600]