The discrete time/resource trade-off problem in project networks: a branch-and-bound approach

被引:35
作者
Demeulemeester, E
De Reyck, B
Herroelen, W
机构
[1] Katholieke Univ Leuven, Dept Appl Econ, B-3000 Louvain, Belgium
[2] London Business Sch, London NW1 4SA, England
关键词
D O I
10.1023/A:1013785108131
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In many solution methods for resource-constrained project scheduling, it is assumed that both the duration of each activity and its resource requirements are known and fixed. In real-life projects, however, it often occurs that only one renewable bottleneck resource is available and that the activities have a total work content which indicates how much work (expressed in man-periods) has to be performed. The objective then is to schedule each activity in one of its possible execution modes, subject to the precedence and resource constraints, in order to minimize the project makespan. We present a branch-and-bound procedure and report computational results, obtained using a full factorial experiment on a randomly generated problem set.
引用
收藏
页码:1059 / 1069
页数:11
相关论文
共 33 条
[1]  
AHN T, 1995, INFORMS NEW ORL FALL
[2]  
Dar-EL E. M., 1973, AIIE Transactions, V5, P343, DOI 10.1080/05695557308974922
[3]   Complexity of the discrete time-cost tradeoff problem for project networks [J].
De, P ;
Dunne, EJ ;
Ghosh, JB ;
Wells, CE .
OPERATIONS RESEARCH, 1997, 45 (02) :302-306
[4]   THE DISCRETE TIME-COST TRADEOFF PROBLEM REVISITED [J].
DE, P ;
DUNNE, EJ ;
GHOSH, JB ;
WELLS, CE .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) :225-238
[5]  
De Reyck B, 1998, NAV RES LOG, V45, P553, DOI 10.1002/(SICI)1520-6750(199809)45:6<553::AID-NAV2>3.0.CO
[6]  
2-1
[7]   A BRANCH-AND-BOUND PROCEDURE FOR THE MULTIPLE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM [J].
DEMEULEMEESTER, E ;
HERROELEN, W .
MANAGEMENT SCIENCE, 1992, 38 (12) :1803-1818
[8]   On the use of the complexity index as a measure of complexity in activity networks [J].
DeReyck, B ;
Herroelen, W .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 91 (02) :347-366
[9]  
DEREYCK B, 1995, 9535 KATH U DEP APPL
[10]   ON THE MEASUREMENT OF COMPLEXITY IN ACTIVITY NETWORKS [J].
ELMAGHRABY, SE ;
HERROELEN, WS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1980, 5 (04) :223-234