Rank-based ant colony algorithms for truss weight minimization with discrete variables

被引:45
作者
Capriles, Priscila V. S. Z.
Fonseca, Leonardo G.
Barbosa, Helio J. C.
Lemonge, Afonso C. C.
机构
[1] LNCC MCT, BR-25651075 Petropolis, RJ, Brazil
[2] Univ Fed Juiz de Fora, Dept Estruturas Campus Univ, Fac Engn, BR-36036330 Juiz De Fora, MG, Brazil
来源
COMMUNICATIONS IN NUMERICAL METHODS IN ENGINEERING | 2007年 / 23卷 / 06期
关键词
ant colony optimization; discrete structural optimization; truss structures;
D O I
10.1002/cnm.912
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
One variant of the ant colony optimization (ACO) metaheuristic, known as rank-based ant system (RBAS), is proposed for weight minimization of structures involving discrete design variables. Stress and displacements constraints are handled using a penalty technique, and the structural analysis is performed by the finite element method. Results obtained for several discrete weight minimization problems show that the RBAS algorithm implemented is effective and competitive when compared with results found by genetic algorithms and another RBAS variant. Copyright (c) 2006 John Wiley & Sons, Ltd.
引用
收藏
页码:553 / 575
页数:23
相关论文
共 19 条
[1]  
[Anonymous], 2004, Ant colony optimization
[2]   Robust truss topology design via semidefinite programming [J].
Ben-Tal, A ;
Nemirovski, A .
SIAM JOURNAL ON OPTIMIZATION, 1997, 7 (04) :991-1016
[3]   OPTIMIZATION METHODS FOR TRUSS GEOMETRY AND TOPOLOGY DESIGN [J].
BENDSOE, MP ;
BENTAL, A ;
ZOWE, J .
STRUCTURAL OPTIMIZATION, 1994, 7 (03) :141-159
[4]  
BONEAUBEAU E, 1999, SWARM INTELLIGENCE
[5]  
Bullnheimer B., 1999, CENTRAL EUROPEAN J O, V7, P25
[6]   Design of space trusses using ant colony optimization [J].
Camp, CV ;
Bichon, BJ .
JOURNAL OF STRUCTURAL ENGINEERING, 2004, 130 (05) :741-751
[7]   Some aspects of truss topology optimization [J].
Cheng, G .
STRUCTURAL OPTIMIZATION, 1995, 10 (3-4) :173-179
[8]  
Christodoulou S., 2005, 5 GRACM INT C COMP M
[9]  
Colorni A., 1996, International Transactions in Operational Research, V3, P1, DOI 10.1111/j.1475-3995.1996.tb00032.x
[10]   War with Iraq: A cost-benefit analysis [J].
Cordesman, AH ;
Wilson, JC ;
Takeyh, R ;
Kemp, G .
MIDDLE EAST POLICY, 2002, 9 (04) :1-24