Flexible Resource-constrained Discrete Time-cost Trade-off Problem Considering Resource Transfer

被引:4
作者
Zou, Haobo [1 ]
Zhou, Guohua [1 ]
机构
[1] Southwest Jiaotong Univ, Sch Econ & Management, Chengdu, Peoples R China
来源
JOURNAL OF INTERNET TECHNOLOGY | 2021年 / 22卷 / 01期
关键词
Repetitive project; Resource transfer; Time cost trade-off; Flexible resource constraint; NSGA-; II; PROJECT SCHEDULING PROBLEM; OPTIMIZATION;
D O I
10.3966/160792642021012201019
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
With the acceleration of global infrastructure construction in recent years, numerous repetitive construction projects are under planning or construction. Resources need to be transferred between units in the construction process. This transfer will lead to a large amount of time and cost consumption, and the existing research on discrete time-cost trade-off problem (DTCTP) of repetitive projects has paid little attention to this issue. This paper introduces an improved resource transfer scheme (DTCTP-rt) considering calculable resource transfer costs, and the calculation results show that this method can obtain a more practical solution. After introducing resource transfer, resource demands conflicts between units become more intense. In order to address this problem, the concept of flexible resource constraint (FRC) is introduced to form FRCDTCTP-rt. The resource constraint is no longer regarded as a fixed constant, but allowed to float arbitrarily in an interval. The calculation results show that considering FRC provides managers with more and better feasible choices.
引用
收藏
页码:197 / 207
页数:11
相关论文
共 32 条
[1]   A multi-agent system for decentralized multi-project scheduling with resource transfers [J].
Adhau, Sunil ;
Mittal, M. L. ;
Mittal, Abhinav .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 146 (02) :646-661
[2]   Resource constrained project scheduling problem with setup times after preemptive processes [J].
Afshar-Nadjafi, Behrouz ;
Majlesi, Mahyar .
COMPUTERS & CHEMICAL ENGINEERING, 2014, 69 :16-25
[3]   Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost [J].
Altuwaim, Ayman ;
El-Rayes, Khaled .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (07)
[4]   Minimizing duration and crew work interruptions of repetitive construction projects [J].
Altuwaim, Ayman ;
El-Rayes, Khaled .
AUTOMATION IN CONSTRUCTION, 2018, 88 :59-72
[5]   LOB and CPM Integrated Method for Scheduling Repetitive Projects [J].
Ammar, Mohammad A. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) :44-50
[6]   GA optimization model for repetitive projects with soft logic [J].
Fan, Su-Ling ;
Sun, Kuo-Shun ;
Wang, Yu-Ren .
AUTOMATION IN CONSTRUCTION, 2012, 21 :253-261
[7]   The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects [J].
Garcia-Nieves, J. D. ;
Ponz-Tienda, J. L. ;
Salcedo-Bernal, A. ;
Pellicer, E. .
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2018, 33 (08) :655-671
[8]   Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm [J].
Ghoddousi, Parviz ;
Eshtehardian, Ehsan ;
Jooybanpour, Shirin ;
Javanmardi, Ashtad .
AUTOMATION IN CONSTRUCTION, 2013, 30 :216-227
[9]  
Gustavsson P, 2018, EVOL COMPUT, V26, P89, DOI [10.1162/evco_a_00204, 10.1162/EVCO_a_00204]
[10]  
Heravi G, 2019, KSCE J CIV ENG, V23, P3265