Mechanisms of the development of water-conducting fracture zone in overlying strata during shortwall block backfill mining: a case study in Northwestern China

被引:30
|
作者
Zhang, Yun [1 ,2 ]
Cao, Shenggen [1 ,2 ]
Guo, Shuai [3 ]
Wan, Tong [1 ,2 ]
Wang, Jijun [3 ]
机构
[1] China Univ Min & Technol, State Key Lab Coal Resources & Safe Min, Xuzhou 221116, Jiangsu, Peoples R China
[2] China Univ Min & Technol, Sch Mines, Xuzhou 221116, Jiangsu, Peoples R China
[3] China Univ Min & Technol, State Key Lab Geomech & Deep Underground Engn, Xuzhou 221116, Jiangsu, Peoples R China
关键词
Protection of water resources; Shortwall block backfill mining; Height of water-conducting fracture zone; Beams on elastic foundation; COAL PILLARS; KEY STRATA; STRENGTH; OVERBURDEN; HEIGHT; SEAMS; ROCK; AREA; ROOM;
D O I
10.1007/s12665-018-7726-6
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this work, a shortwall block backfill mining (SBBM) technique is proposed for the recovery of residual corner coal pillars and irregular blocks left behind during the exploitation of coal mines, and a solution is provided for the risks associated with gangue piling and the loss of water resources owing to coal mining. Based on the theory of beams on elastic foundations, a mechanical analysis model was established for calculating the height of a water-conducting fracture zone (WCFZ) in the overlying strata of coal mines exploited using the SBBM technique. It was found that the key factors influencing the development of the WCFZ are the mining height, width of the protective coal pillars, backfill percentage, block length, and number of mining blocks. The relationships between these factors and the height of the WCFZ were obtained by incorporating the relevant parameters in the above-mentioned model. In the field experiment site, it was discovered that the minimum coal pillar width and goaf backfill percentage required to prevent the development of water-conducting fractures that could reach an aquifer are 5 m and 65%, respectively. Based on this result, the protective pillars of the site were designed to be 5 m wide, while the goaf backfill percentage was set as 80%. The borehole fluid method was used to measure the height of the WCFZ, which was found to be 26.8 m. This is consistent with the theoretical calculations (27.0 m) of this study, and thus, validates the reliability of the proposed mechanical model. The findings of this work will improve the recovery rate of residual coal resources in coal mining areas, and they are significant for the refinement of water conservation mining theories.
引用
收藏
页数:17
相关论文
共 43 条
  • [1] Mechanisms of the development of water-conducting fracture zone in overlying strata during shortwall block backfill mining: a case study in Northwestern China
    Yun Zhang
    Shenggen Cao
    Shuai Guo
    Tong Wan
    Jijun Wang
    Environmental Earth Sciences, 2018, 77
  • [2] Prediction of the Heights of the Water-Conducting Fracture Zone in the Overlying Strata of Shortwall Block Mining Beneath Aquifers in Western China
    Zhang, Yun
    Cao, Shenggen
    Gao, Rui
    Guo, Shuai
    Lan, Lixin
    SUSTAINABILITY, 2018, 10 (05)
  • [3] Analysis on the mechanical properties of water-conducting fractures development during the shortwall block mining
    Zhang Y.
    Cao S.
    Lai X.
    Shan P.
    Zhang N.
    Zhao C.
    Du S.
    Meitan Xuebao/Journal of the China Coal Society, 2020, 45 : 551 - 560
  • [4] A Simple and Efficient Way to Detect the Mining Induced Water-conducting Fractured Zone in Overlying Strata
    Zhang, Shengtang
    Liu, Yin
    2012 INTERNATIONAL CONFERENCE ON FUTURE ENERGY, ENVIRONMENT, AND MATERIALS, PT A, 2012, 16 : 70 - 75
  • [5] Calculation of the Height of the Water-Conducting Fracture Zone Based on the Analysis of Critical Fracturing of Overlying Strata
    Tan, Yi
    Cheng, Hao
    Lv, Wenyu
    Yan, Weitao
    Guo, Wenbing
    Zhang, Yujiang
    Qi, Tingye
    Yin, Dawei
    Wei, Sijiang
    Ren, Jianji
    Xin, Yajun
    SUSTAINABILITY, 2022, 14 (09)
  • [6] Formation mechanism and height calculation of the caved zone and water-conducting fracture zone in solid backfill mining
    Li, Lei
    Li, Fengming
    Zhang, Yong
    Yang, Daming
    Liu, Xue
    INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2020, 7 (01) : 208 - 215
  • [7] Formation mechanism and height calculation of the caved zone and water-conducting fracture zone in solid backfill mining
    Lei Li
    Fengming Li
    Yong Zhang
    Daming Yang
    Xue Liu
    International Journal of Coal Science & Technology, 2020, 7 : 208 - 215
  • [8] Measurement and numerical analysis of water-conducting fractured zone in solid backfill mining under an aquifer: a case study in China
    Li, Meng
    Zhang, Jixiong
    Deng, Xuejie
    Ju, Feng
    Li, Baiyi
    QUARTERLY JOURNAL OF ENGINEERING GEOLOGY AND HYDROGEOLOGY, 2017, 50 (01) : 81 - 87
  • [9] Temporal and Spatial Evolution Mechanisms of the Water-Conducting Fractured Zone of Overlying Strata in the Kongzhuang Coal Mine
    Zhang, Pei-ding
    Sun, Chao-shang
    Fan, Xuan
    Li, Song-tao
    Wang, Long-jing
    Cao, Zheng-zheng
    GEOFLUIDS, 2023, 2023
  • [10] Study on the developmentmechanism and control of water-conducting fracturesinshort-wall block backfill mining
    Zhang Y.
    Cao S.
    Lai X.
    Zhao C.
    Du S.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2019, 36 (06): : 1086 - 1092