Validation of an integrated influential factors (IIFs) model as a panacea to curb projects completion delay in Yemen

被引:5
作者
Al-Fadhali, Najib [1 ]
Mansir, Dodo [2 ]
Zainal, Rozlin [1 ]
机构
[1] Univ Tun Hussein Onn Malaysia, Fac Technol Management & Business, Batu Pahat, Malaysia
[2] Ahmadu Bello Univ, Dept Bldg, Zaria, Nigeria
关键词
Validation; Project management; IIFs model; Internal stakeholders; Project completion delay; CRITICAL SUCCESS FACTORS; CONSTRUCTION PROJECTS; STAKEHOLDER MANAGEMENT; COST OVERRUNS; IMPACT;
D O I
10.1108/JSTPM-08-2018-0080
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose Influential factors attributed to causing project completion delay (PCD) differ because of prevailing variability of local conditions. Construction projects specifically in Yemen (and other developing countries) experience devastating effects of PCD which include litigation, cost overrun, arbitration, abandonment and failure. While existing works have investigated the causes and effects of PCD, not much exist on approaches to optimizing its occurrence in Yemen. In a bid to enhance the effects of PCD in Yemen, the integrated influential factors (IIFs), which is a construction-party specific model, was developed to mitigate the effects of PCD in Yemen. As a build up to the development of this model, this paper aims to validate the IIFs model with a view to foster its application to enhance PCD in construction project delivery in Yemen. Design/methodology/approach The validation of the IIFs model was done through seeking the opinions of 12 selected construction industry experts. This involved using a structured questionnaire to seek information on the sustainability of implementing the IIFs model. Findings The findings revealed that if the IIFs model is vigorously implemented, it would go a long way in curbing delay in the delivery of construction projects, making construction delivery less risky due to the effects of delay. Research limitations/implications - The study is limited to only influential factors of internal stakeholders of the construction phase. Similarly, the study was only conducted in the state of Sana'a, Yemen. The implication of the adoption of the IIFs model is that it can hopefully serve as an adaptive controller to construction project delivery relative to the specific parameters and factors investigated in this study. Originality/value The IIFs model is a novel approach to optimizing PCD in Yemen specific to both the construction-phase and internal stakeholders. Existing studies on PCD in Yemen, although investigating the causes and effect of PCD, hardly proffer any approach to optimizing PCD for successful construction project delivery.
引用
收藏
页码:793 / 811
页数:19
相关论文
共 56 条
[1]  
Abdullah M.R., 2010, SIGNIFICANT CAUSES E
[2]  
Ahmad R., 2013, CULTURAL LANDSCAPES
[3]  
Al-Dairi A., 2011, THESIS
[4]  
AL-fadhali N, 2018, P 21 INT S ADV CONST
[5]   The desirability of Integrated Influential Factors (IIFs) Model of internal stakeholder as a panacea to project completion delay in Yemen [J].
Al-Fadhali, Najib ;
Zainal, Rozlin ;
Kasim, Narimah ;
Dodo, Mansir ;
Soon, Ng Kim ;
Hasaballah, Abdel Hafiz Ali .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (02) :128-136
[6]   Development of a Conceptual Integrated Influential Factors (IIF) Model of Internal Stakeholder for Construction Projects Successful Completion in Yemen [J].
Al-Fadhali, Najib ;
Zainal, Rozlin ;
Kim-Soon, Ng ;
Hasaballah, Abdel Hafiez Ali ;
Ahmad, Abd Rahman .
ADVANCED SCIENCE LETTERS, 2018, 24 (05) :2979-2984
[7]   Delay and Cost Overrun in Infrastructure Projects in Jordan [J].
Al-Hazim, Nabil ;
Abu Salem, Zaydoun ;
Ahmad, Hesham .
7TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT, 2017, 182 :18-24
[8]   Determining Critical Success Factors of Project Management Practice: A conceptual framework [J].
Alias, Zarina ;
Zawawi, E. M. A. ;
Yusof, Khalid ;
Aris, N. M. .
AMER INTERNATIONAL CONFERENCE ON QUALITY OF LIFE, AICQOL2014, 2014, 153 :61-69
[9]   A Framework for Identifying Causal Factors of Delay in Nuclear Power Plant Projects [J].
Alsharif, Samer ;
Karatas, Aslihan .
ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 :1486-1492
[10]  
[Anonymous], INT C EC ADM