Production-Outsourcing Supply Chain Quality Management Based on Multi-Agent System

被引:0
作者
Lou, Ping [1 ]
Liu, Quan [1 ]
Zhou, Zude [1 ]
Quan, Shuhai [1 ]
机构
[1] Wuhan Univ Technol, Sch Automat, Wuhan 430070, Hubei, Peoples R China
来源
2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS | 2009年
关键词
supply chain; quality management; multi-agent system; incentive mechanism; IMPERFECT QUALITY; MODEL;
D O I
10.1109/ICIEEM.2009.5344372
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Quality is one of the most important factors for an enterprise to win the competition. Production-outsourcing supply chain (POSC) is a kind of special supply chain in which the core enterprise transfer the manufacturing of products to the other enterprises. It results in the separation of two important stages-product designing and product manufacturing for forming product quality, that is product design and product manufacture are completed by different enterprises respectively. Traditional quality management which focuses on the inside of enterprise and emphasizes the coordination and cooperation of processes, elements and department inside an enterprise cannot satisfy the requirements of this kind of POSC quality management. In this paper, the architecture of a distributed cooperative quality management based on multi-agent system is presented. And an incentive mechanism is put forward to achieve the distributed cooperative quality management for this kind of POSC based on the information sharing through this architecture.
引用
收藏
页码:1555 / 1559
页数:5
相关论文
共 12 条
[1]   Quality and competition [J].
Banker, RD ;
Khosla, I ;
Sinha, KK .
MANAGEMENT SCIENCE, 1998, 44 (09) :1179-1192
[2]   Production lot sizing with the reworking of imperfect quality items produced [J].
Hayek, PA ;
Salameh, MK .
PRODUCTION PLANNING & CONTROL, 2001, 12 (06) :584-590
[3]   A replication and extension of quality management into the supply chain [J].
Kaynak, Hale ;
Hartley, Janet L. .
JOURNAL OF OPERATIONS MANAGEMENT, 2008, 26 (04) :468-489
[4]   Integrated process planning and scheduling in a supply chain [J].
Moon, Chiung ;
Lee, Young Hae ;
Jeong, Chan Seok ;
Yun, YoungSu .
COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) :1048-1061
[5]  
PARPACHRISTOS S, 2006, INT J PRODUCT EC, V100, P148
[6]   OPTIMAL LOT SIZING, PROCESS QUALITY IMPROVEMENT AND SETUP COST REDUCTION [J].
PORTEUS, EL .
OPERATIONS RESEARCH, 1986, 34 (01) :137-144
[7]   Defining the concept of supply chain quality management and its relevance to academic and industrial practice [J].
Robinson, CJ ;
Malhotra, MK .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (03) :315-337
[8]   ECONOMIC PRODUCTION CYCLES WITH IMPERFECT PRODUCTION PROCESSES [J].
ROSENBLATT, MJ ;
LEE, HL .
IIE TRANSACTIONS, 1986, 18 (01) :48-55
[9]   Economic production quantity model for items with imperfect quality [J].
Salameh, MK ;
Jaber, MY .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 64 (1-3) :59-64
[10]   A Web-based ERP system for business services and supply chain management: Application to real-world process scheduling [J].
Tarantilis, C. D. ;
Kiranoudis, C. T. ;
Theodorakopoulos, N. D. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :1310-1326