The current use of industrialized construction techniques in France: Benefits, limits and future expectations

被引:25
作者
Attouri, Emna [1 ]
Lafhaj, Zoubeir [1 ]
Ducoulombier, Laure [2 ]
Lineatte, Bruno [2 ]
机构
[1] Univ Lille, CNRS, LAMcube Lab Mecan, Cent Lille,UMR 9013,Multiphys,Multiechelle, F-59000 Lille, France
[2] Bouygues Construct, Res & Dev Dept, Paris, France
来源
CLEANER ENGINEERING AND TECHNOLOGY | 2022年 / 7卷
关键词
Offsite construction; Prefabrication; Construction industrialization; Questionnaire survey; France; OFF-SITE PRODUCTION; PREFABRICATION; OPPORTUNITIES; CONSTRAINTS; CHALLENGES; SELECTION; BARRIERS; CRITERIA; OFFSITE;
D O I
10.1016/j.clet.2022.100436
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Offsite construction has been considered by academics and practitioners in many countries as an efficient way of delivering buildings. The benefits concerning time, cost and quality are well-documented. Even though the use of this technique provides many significant advantages, the current level of using these techniques in the French construction industry is limited. In addition, research studies that investigate this topic in France are rare. For these reasons, this study aims to fill the gap by first, explore the definition of construction industrialization in the French construction context and second, investigate the perceived benefits and hindrances of prefabrication's applications. A questionnaire survey was conducted in order to target the main construction industry players: manufacturers, contractors, designers and consultants. More than 55 questionnaires were completed and returned. The results indicated that advantages of using these techniques include improving productivity, minimizing construction time, improving quality, reducing waste and openness to industrialization and automation of construction. The top four hindrances were requirement of a long coordination work between the design office and the pre-manufacturer before starting production, inability to block the design early enough to start production at the factory, key decisions already taken exclude the prefabrication approach and the obligation to accept the lowest cost.
引用
收藏
页数:10
相关论文
共 53 条
[1]  
Alinaitwe H. M., 2006, Journal of Civil Engineering and Management, V12, P221
[2]  
[Anonymous], 2016, J SCI RES DEV
[3]   Integration of ELECTRE III and PROMETHEE II Decision-Making Methods with an Interval Approach: Application in Selection of Appropriate Structural Systems [J].
Balali, Vahid ;
Zahraie, Banafsheh ;
Roozbahani, Abbas .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2014, 28 (02) :297-314
[4]  
Balali Vahid, J COMPUT CIVIL ENG, V28, P297, DOI [10.1061/(ASCE)CP.1943-5487.0000254, DOI 10.1061/(ASCE)CP.1943-5487.0000254]
[5]   Benefit evaluation for off-site production in construction [J].
Blismas, Nick ;
Pasquire, Christine ;
Gibb, Alistair .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (02) :121-130
[6]   Constraints to the Use of Off-site Production on Construction Projects [J].
Blismas, Nick G. ;
Pendlebury, Martyn ;
Gibb, Alistair ;
Pasquire, Christine .
ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2005, 1 (03) :153-162
[7]   Mobile ICT support for construction process improvement [J].
Bowden, Sarah ;
Dorr, Alex ;
Thorpe, Tony ;
Anumba, Chimay .
AUTOMATION IN CONSTRUCTION, 2006, 15 (05) :664-676
[8]   Off-Site Construction of Apartment Buildings [J].
Boyd, Neville ;
Khalfan, Malik M. A. ;
Maqsood, Tayyab .
JOURNAL OF ARCHITECTURAL ENGINEERING, 2013, 19 (01) :51-57
[9]   Dynamics of Project-Based Collaborative Networks for BIM Implementation: Analysis Based on Stochastic Actor-Oriented Models [J].
Cao, Dongping ;
Li, Heng ;
Wang, Guangbin ;
Luo, Xiaochun ;
Yang, Xincong ;
Tan, Dan .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (03)
[10]   Performance of Mediator Tactics in Building Management Disputes [J].
Cheung, Sai On ;
Chow, Pui Ting ;
Tse, Jo Kenneth Maduramente .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (02)