An integrated mathematical model of dynamic production and maintenance planning in pumped-storage hydroelectricity

被引:2
作者
Asgari, Farid [1 ]
Jolai, Fariborz [2 ]
Movahedisobhani, Farzad [1 ]
机构
[1] Islamic Azad Univ, Dept Ind Engn, Sci & Res Branch, Tehran, Iran
[2] Univ Tehran, Coll Engn, Syst & Ind Engn Sch, Tehran, Iran
关键词
Production; Energy; Maintenance; Heuristics; Production planning; Maintenance and rehabilitation; Pumped-storage hydroelectricity; Meta-heuristic algorithm; OPTIMIZATION ALGORITHM; TRANSPORTATION PROBLEM; JOINT OPTIMIZATION; GENETIC ALGORITHM; QUALITY-CONTROL; STRATEGIES; SYSTEMS; POLICY;
D O I
10.1108/JM2-10-2020-0264
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose Pumped-storage hydroelectricity (PSH) is considered as an effective method to moderate the difference in demand and supply of electricity. This study aims to understanding of the high capacity of energy production, storage and permanent exploitation has been the prominent feature of pumped-storage hydroelectricity. Design/methodology/approach In this paper, the optimization of energy production and maintenance costs in one of the large Iranian PSH has been discussed. Hence, a mathematical model mixed integer nonlinear programming developed in this area. Minimizing the difference in supply and demand in the energy production network to multiple energies has been exploited to optimal attainment scheme. To evaluate the model, exact solution CPLEX and to solve the proposed programming model, the efficient metaheuristics are utilized by the tuned parameters achieved from the Taguchi approach. Further analysis of the parameters of the problem is conducted to verify the model behavior in various test problems. Findings The results of this paper have shown that the meta-heuristic algorithm has been done in a suitable time, despite the approximation of the optimal answer, and the consequences of research indicate that the model proposed in the studied power plant is applicable. Originality/value In pumped-storage hydroelectricity plants, one of the main challenges in energy production issues is the development of production, maintenance and repair scheduling concepts that improves plant efficiency. To evaluate the mathematical model presented, exact solution CPLEX and to solve the proposed bi-objective mixed-integer linear programming model, set of efficient metaheuristics are used. Therefore, according to the level of optimization performed in the case study, it has caused the improvement of planning by 7%-12% and effective optimization processes.
引用
收藏
页码:1213 / 1240
页数:28
相关论文
共 58 条
[1]   Innovative approaches to design and address green supply chain network with simultaneous pick-up and split delivery [J].
Abdi, Andisheh ;
Abdi, Anita ;
Akbarpour, Navid ;
Amiri, Amirhossein Salehi ;
Hajiaghaei-Keshteli, Mostafa .
JOURNAL OF CLEANER PRODUCTION, 2020, 250
[2]   A set of calibrated metaheuristics to address a closed-loop supply chain network design problem under uncertainty [J].
Abdi, Anita ;
Abdi, Andisheh ;
Fathollahi-Fard, Amir Mohammad ;
Hajiaghaei-Keshteli, Mostafa .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2021, 8 (01) :23-40
[3]   Discrete-Time MILP Formulation for the Optimal Scheduling of Maintenance Tasks on Oil and Gas Production Assets [J].
Achkar, Victoria G. ;
Cafaro, Vanina G. ;
Mendez, Carlos A. ;
Cafaro, Diego C. .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2019, 58 (19) :8231-8245
[4]   Medium-term optimization-based approach for the integration of production planning, scheduling and maintenance [J].
Aguirre, Adrian M. ;
Papageorgiou, Lazaros G. .
COMPUTERS & CHEMICAL ENGINEERING, 2018, 116 :191-211
[6]  
Akkas Op, 2019, 2019 3 INT S MULTIDI, P1
[7]   Providing an integrated Model for Planning and Scheduling Energy Hubs and preventive maintenance [J].
Amiri, S. ;
Honarvar, M. ;
Sadegheih, A. .
ENERGY, 2018, 163 :1093-1114
[8]   Determination of the optimal sales level of perishable goods in a two-echelon supply chain network [J].
Amiri, Seyyed Amir Hossein Salehi ;
Zahedi, Ali ;
Kazemi, Morteza ;
Soroor, Javad ;
Hajiaghaei-Keshteli, Mostafa .
COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 139 (139)
[9]   Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell [J].
Berthaut, F. ;
Gharbi, A. ;
Dhouib, K. .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2011, 39 (06) :642-654
[10]   On the robustness of joint production and maintenance scheduling in presence of uncertainties [J].
Boudjelida, Abdelhamid .
JOURNAL OF INTELLIGENT MANUFACTURING, 2019, 30 (04) :1515-1530