Scheduling methods for the statistical setup adjustment problem

被引:4
作者
Pan, R [1 ]
Del Castillo, E [1 ]
机构
[1] Penn State Univ, Dept Ind & Mfg Engn, University Pk, PA 16802 USA
关键词
D O I
10.1080/0020754031000065142
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Feedback control methods have been proposed in recent literature to regulate the quality characteristic of parts or products in a manufacturing process. Depending on the costs involved, adjustments may not be needed at each time instant (i.e. for every part or product). This paper presents scheduling methods to determine the optimal time instants for adjusting a process. The focus is on the set-up adjustment problem, in which it is necessary to adjust the process in order to compensate for an initial offset that occurs due to an incorrect set-up operation. The performance of three scheduling methods are compared in terms of the expected manufacturing cost and computational effort of each method. The adjustment methods considered are based on estimates of the process variance and the size of the offset. The robustness of these methods with respect to biased estimates of the process variance and of the set-up error or offset are discussed. One simple method, a backward implementation of the Silver-Meal heuristic used for inventory control is recommended based on a performance analysis.
引用
收藏
页码:1467 / 1481
页数:15
相关论文
共 18 条
[1]   AN ANALYSIS OF TAGUCHI ONLINE PROCESS-CONTROL PROCEDURE UNDER A RANDOM-WALK MODEL [J].
ADAMS, BM ;
WOODALL, WH .
TECHNOMETRICS, 1989, 31 (04) :401-413
[2]  
[Anonymous], B INT STAT I
[3]  
BOX G, 1992, TECHNOMETRICS, V34, P251, DOI 10.2307/1270028
[4]   AN SPC MODEL FOR SHORT PRODUCTION-RUNS - MINIMIZING EXPECTED COST [J].
CROWDER, SV .
TECHNOMETRICS, 1992, 34 (01) :64-73
[5]  
DELCASTILLO E, 2002, IN PRESS COMMUNICATI
[6]  
DELCASTILLO E, 2002, IN PRESS J QUALITY T
[7]   LINEAR DYNAMIC RECURSIVE ESTIMATION FROM VIEWPOINT OF REGRESSION-ANALYSIS [J].
DUNCAN, DB ;
HORN, SD .
JOURNAL OF THE AMERICAN STATISTICAL ASSOCIATION, 1972, 67 (340) :815-821
[8]  
GRUBBS FE, 1983, J QUAL TECHNOL, V15, P186
[9]  
PAN R, 2002, INTEGRATION SEQUENTI
[10]  
Silver E, 1998, INVENTORY MANAGEMENT