Synthesis and Evaluation of Fast Onload Multitap Changers for Flicker Compensation in AC Arc Furnaces

被引:7
作者
Cagigal Olay, Carlos [1 ,2 ]
Monteso Fernandez, Santiago [2 ]
Hernandez Bayo, Araceli [3 ]
Campo Rodriguez, Juan Carlos [4 ]
Martinez Garcia, Salvador [2 ]
机构
[1] R Bosch Espana Gasoline Syst SA, Madrid 28300, Spain
[2] Univ Nacl Educ Distancia, DIEEC, E-28040 Madrid, Spain
[3] Univ Politecn Madrid, Dept Ingn Elect, E-28006 Madrid, Spain
[4] Univ Oviedo, Dept Ingn Elect Elect Comp & Sistemas, Gijon 33204, Spain
关键词
AC arc furnace; ac voltage stabilizer; flicker compensator; onload tap-changer; power quality (PQ);
D O I
10.1109/TPWRD.2014.2349431
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper evaluates the abilities of fast tap-changer topologies by using insulated-gate bipolar transistors to mitigate flicker generated by the ac electric arc furnaces, based on technical and economic criteria. The design problems derived from the very high powers and currents involved have been solved to a preliminary industrial level. The operation of the best resulting topology is verified on a real 80-MVA arc furnace with a dedicated graphical-mathematical multilevel simulator developed to perform short-and long-term tests. Selected pattern windows of the arc voltage, taken from exhaustive logs of electric variables of a real 80-MVA furnace during a complete meltdown process, have been loaded into the simulator. This novel simulation strategy enables the testing of the proposed compensator under reproduced "real working conditions" with several degrees of flicker severity. The simulator includes an IEC flicker meter capable of checking the flicker level online at any point in the installation. The simple open-loop and closed-loop control tests confirm the new tap changer as a fast and economical competitor to other arc furnace compensators. It manages 16% of the furnace system power at a subcycle or super-cycle tap changing rate (between 0 and 10 changes per half cycle), as required. This fast switching capacity reduces the compensating time to the very limited values imposed by the L/R time constant of the furnace installation.
引用
收藏
页码:2519 / 2527
页数:9
相关论文
共 21 条
[1]  
Abdulrahman H., 2005, P POW EL APPL EUR C, P1
[2]  
[Anonymous], 61000415 IEC
[3]  
[Anonymous], 14592010 IEEE
[4]   Cross-phase voltage sag compensator for three-phase distribution systems [J].
Babaei, Ebrahim ;
Kangarlu, Mohammad Farhadi .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 51 :119-126
[5]   Active power filters for line conditioning:: A critical evaluation [J].
Barrero, F ;
Martínez, S ;
Yeves, F ;
Martínez, PM .
IEEE TRANSACTIONS ON POWER DELIVERY, 2000, 15 (01) :319-325
[6]   Harmonics, interharmonics and unbalances of arc furnaces:: A new frequency domain approach [J].
Beites, LF ;
Mayordomo, JG ;
Hernández, A ;
Asensi, R .
IEEE TRANSACTIONS ON POWER DELIVERY, 2001, 16 (04) :661-668
[7]  
Cagigal C., THESIS U DISTANCIA M
[8]   Optimal configurations for taps of windings and power electronic switches in electronic tap-changers [J].
Faiz, J ;
Siahkolah, B .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2002, 149 (05) :517-524
[9]   MEASUREMENT AND PREDICTION OF VOLTAGE FLICKER MAGNITUDE AND FREQUENCY [J].
GIRGIS, AA ;
STEPHENS, JW ;
MAKRAM, EB .
IEEE TRANSACTIONS ON POWER DELIVERY, 1995, 10 (03) :1600-1605
[10]  
Grunbaum R., 2010, 2010 INT POW EL C IP