Simulation Research for the Influence of Mining Sequence on Coal Pillar Stability under Highwall Mining Method

被引:4
|
作者
Huang, Jing [1 ]
Meng, Fanbao [1 ]
Wang, Ge [2 ]
Wu, Yingkui [2 ]
Wen, Jinhao [3 ]
机构
[1] Shandong Univ Sci & Technol, Coll Energy & Min Engn, Qingdao 266590, Shandong, Peoples R China
[2] Taian Taishuo Strata Control Technol Co Ltd, Tai An 271000, Shandong, Peoples R China
[3] China Univ Min & Technol Beijing, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
关键词
DESIGN;
D O I
10.1155/2021/8864339
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
Highwall mining, which is referred to the technique of extracting coal from the bottom of an exposed highwall, features safety, efficiency, and economy. According to existing highwall mining methods, the mining sequence has a great influence on highwall stability. Based on a highwall mining project in Australia, this study adopted the FLAC(3D) numerical simulation method to investigate the stability of coal pillars with different mining sequences. The results show that different mining sequences of boreholes exert a great effect on highwall stability. Compared with sequential mining, the skip mining method achieves higher speed of highwall stabilization and smaller plastic zone of coal pillar with its maximum strength decreasing by 12%. By adjusting the mining sequence scientifically, the coal pillar failure and roof collapse caused by the deviation of mining angle can be avoided. The results may provide a new angle for the studies on the coal pillar layout and stability design in highwall mining.
引用
收藏
页数:9
相关论文
共 50 条
  • [31] Effect of mining parameters on surface deformation and coal pillar stability under customized shortwall mining of deep extra-thick coal seams
    Jiang, Shuyin
    Fan, Gangwei
    Li, Qizhen
    Zhang, Shizhong
    Chen, Liang
    ENERGY REPORTS, 2021, 7 : 2138 - 2154
  • [32] To the calculation of pillar stability under condition of chamber mining
    Baryakh, A. A.
    Samodelkina, N. A.
    JOURNAL OF MINING SCIENCE, 2007, 43 (01) : 8 - 16
  • [33] To the calculation of pillar stability under condition of chamber mining
    A. A. Baryakh
    N. A. Samodelkina
    Journal of Mining Science, 2007, 43 : 8 - 16
  • [34] Study on the Mechanism of Progressive Instability of Special-Shaped Coal Pillar and the Stability Control of Roadway Under the Influence of Mining
    Chen, Dingchao
    Wang, Xiangyu
    Zhang, Feiteng
    Bai, Jianbiao
    Zhao, Xiangqian
    Li, Menglong
    Yu, Yang
    Wang, Xiangdong
    Sun, Shiqi
    ROCK MECHANICS AND ROCK ENGINEERING, 2024, 57 (08) : 6461 - 6483
  • [35] Short Wall Box Style Mining Method of Strip Coal Pillar under Town
    Guo, Zhongping
    Li, Jiazhuo
    Li, Changhua
    Ge, Haibin
    FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE II, PTS 1-6, 2012, 121-126 : 4146 - +
  • [36] Highwall mining method alternatives for thick coal seams and investigation of the backfilling method by numerical modelling
    Ceyhan, Mahmut Murat
    Ünver, Bahtiyar
    Yaşitli, Nazmi Erhan
    Madencilik, 2006, 45 (02): : 3 - 16
  • [37] Practical research on coal pillar retention in deep mining roadways
    Wang, Lei
    Liu, Gang
    Ma, Pingyun
    Duan, Binyang
    Wang, Fengxiang
    Zhu, Yongtao
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [38] Stability analysis of rib pillars in highwall mining under dynamic and static loads in open-pit coal mine
    Wu, Haoshuai
    Chen, Yanlong
    Lv, Haoyan
    Xie, Qihang
    Chen, Yuanguang
    Gu, Jun
    INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2022, 9 (01)
  • [39] Research on the impact of water inrush on the stability of coal pillar in a mining face based on the three-field coupling method
    Zhang, Yugeng
    Xue, Bingqing
    Liu, Xuguo
    Wei, Jingxuan
    Li, Yuqun
    Zhang, Lijian
    Zhang, Heng
    Jia, Ziyue
    ENERGY EXPLORATION & EXPLOITATION, 2025,
  • [40] Classification of Stability of Highwall During Highwall Mining: A Statistical Adaptive Learning Approach
    Chandar, K. Ram
    Hegde, Chiranth
    Yellishetty, Mohan
    Kumar, B. Gowtham
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2015, 33 (03) : 511 - 521