Simulation Research for the Influence of Mining Sequence on Coal Pillar Stability under Highwall Mining Method

被引:4
|
作者
Huang, Jing [1 ]
Meng, Fanbao [1 ]
Wang, Ge [2 ]
Wu, Yingkui [2 ]
Wen, Jinhao [3 ]
机构
[1] Shandong Univ Sci & Technol, Coll Energy & Min Engn, Qingdao 266590, Shandong, Peoples R China
[2] Taian Taishuo Strata Control Technol Co Ltd, Tai An 271000, Shandong, Peoples R China
[3] China Univ Min & Technol Beijing, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
关键词
DESIGN;
D O I
10.1155/2021/8864339
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
Highwall mining, which is referred to the technique of extracting coal from the bottom of an exposed highwall, features safety, efficiency, and economy. According to existing highwall mining methods, the mining sequence has a great influence on highwall stability. Based on a highwall mining project in Australia, this study adopted the FLAC(3D) numerical simulation method to investigate the stability of coal pillars with different mining sequences. The results show that different mining sequences of boreholes exert a great effect on highwall stability. Compared with sequential mining, the skip mining method achieves higher speed of highwall stabilization and smaller plastic zone of coal pillar with its maximum strength decreasing by 12%. By adjusting the mining sequence scientifically, the coal pillar failure and roof collapse caused by the deviation of mining angle can be avoided. The results may provide a new angle for the studies on the coal pillar layout and stability design in highwall mining.
引用
收藏
页数:9
相关论文
共 50 条
  • [11] Reasonable coal pillar design and remote control mining technology for highwall residual coal resources
    Wang, Fangtian
    Zhang, Cun
    ROYAL SOCIETY OPEN SCIENCE, 2019, 6 (04):
  • [12] Mining simulation for room and pillar coal operation
    Pereira, S. P.
    Costa, J. F. C. L.
    Salvadoretti, P.
    Koppe, J.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2012, 112 (06) : 473 - 476
  • [13] Mining simulation for room and pillar coal operation
    Pereira, Sandro Pinzon
    Coimbra Leite Costa, Joao Felipe
    Salvadoretti, Paulo
    Koppe, Jair Carlos
    REM-REVISTA ESCOLA DE MINAS, 2010, 63 (03) : 581 - 589
  • [14] Web pillar design approach for Highwall Mining extraction
    Porathur, John L.
    Karekal, S.
    Palroy, P.
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2013, 64 : 73 - 83
  • [15] Coal pillar destabilization prediction and mining method in residual mining areas under remining disturbances
    Wen, Guang
    Gong, Peilin
    Zhu, Yanhui
    Yi, Kang
    Li, Peng
    Kang, Hui
    Tian, Ye
    ENERGY SCIENCE & ENGINEERING, 2024, 12 (03) : 492 - 507
  • [16] A study of highwall mining panel stability
    Adhikary, DP
    Shen, B
    Fama, MED
    INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2002, 39 (05) : 643 - 659
  • [17] Mining system for remaining coal of final highwall
    Y. L. Chen
    Q. X. Cai
    T. Shang
    Z. X. Che
    Journal of Mining Science, 2011, 47 : 771 - 777
  • [18] Influence mechanism of pillar-side backfilling on the overburden-coal pillar system's stability under upward mining
    Ma, Junbiao
    Bai, Jinwen
    Cui, Boqiang
    Feng, Guorui
    Wang, Shanyong
    Shi, Xudong
    Pan, Ruikai
    Xun, Jianliang
    Fan, Zhiqiang
    MATERIALS TODAY COMMUNICATIONS, 2025, 44
  • [19] Mechanical Analysis of Coal Pillar Stability in Strip Mining
    Yang Jing
    Liu Ning
    Mao Xianbiao
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL VII, PTS A AND B, 2008, 7 : 1680 - 1683
  • [20] The application research on backfill mining technology of gangue for coal pillar mining in Xingtai mining village
    Ma, Li
    Ding, Ziwei
    ADVANCED MANUFACTURING TECHNOLOGY, PTS 1, 2, 2011, 156-157 : 225 - 231