Balanced cable routing for offshore wind farms with obstacles

被引:11
作者
Cazzaro, Davide [1 ,2 ]
Pisinger, David [1 ]
机构
[1] Tech Univ Denmark, DTU Management, Akad Vej 358, DK-2800 Lyngby, Denmark
[2] Vattenfall BA Wind, Jupitervej 6, DK-6000 Kolding, Denmark
关键词
large neighborhood search; math-heuristic; network design; offshore wind farms; sweep algorithm; visibility graph; OPTIMIZATION;
D O I
10.1002/net.22100
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
The cable routing problem is the task of designing theminimum-cost electrical network between the turbines of offshore wind farmswhile satisfying several constraints. It contributes to decreasing wind energycosts, favoring the green transition. This paper focuses on balanced cablerouting, studying both branched and radial network topology. First, we proposea visibility graph to route cables around obstacles and boundaries present inthe wind farm area. Next, we develop a novel Large Neighborhood Search (LNS)heuristic using neighborhoods of increasing complexity: swap, exchanging two turbines between root-branches; double swap, exchanging two pairs of turbines; cycle swap, moving turbines between root-branches; and re-partition, re-partitioning and re-routing two adjacentroot-branches. We also extend the LNS heuristic to the unbalanced branchedconfiguration to compare to existing literature. On average, it finds solutionsof the same quality using two orders of magnitude less run-time, improving thesolutions in five cases.
引用
收藏
页码:386 / 406
页数:21
相关论文
共 24 条
[1]  
[Anonymous], 2013, PowerTech (POWERTECH), 2013 IEEE Grenoble
[2]  
[Anonymous], 2015, 2015 50 INT U POWER
[3]   The offshore wind farm array cable layout problem: a planar open vehicle routing problem [J].
Bauer, Joanna ;
Lysgaard, Jens .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2015, 66 (03) :360-368
[4]  
BVG Associates on behalf of The Crown Estate and the Offshore Renewable Energy Catapult, 2019, GUID OFFSH WIND FARM
[5]   Variable neighborhood search for large offshore wind farm layout optimization [J].
Cazzaro, Davide ;
Pisinger, David .
COMPUTERS & OPERATIONS RESEARCH, 2022, 138
[6]   Heuristic algorithms for the Wind Farm Cable Routing problem [J].
Cazzaro, Davide ;
Fischetti, Martina ;
Fischetti, Matteo .
APPLIED ENERGY, 2020, 278
[7]   SCHEDULING OF VEHICLES FROM CENTRAL DEPOT TO NUMBER OF DELIVERY POINTS [J].
CLARKE, G ;
WRIGHT, JW .
OPERATIONS RESEARCH, 1964, 12 (04) :568-&
[8]  
Das K., 2017, Offshore wind power plant technology catalogue-components of wind power plants
[9]   Vattenfall Optimizes Offshore Wind Farm Design [J].
Fischetti, Martina ;
Kristoffersen, Jesper Runge ;
Hjort, Thomas ;
Monaci, Michele ;
Pisinger, David .
INFORMS JOURNAL ON APPLIED ANALYTICS, 2020, 50 (01) :80-94
[10]   Optimal wind farm cable routing: Modeling branches and offshore transformer modules [J].
Fischetti, Martina ;
Pisinger, David .
NETWORKS, 2018, 72 (01) :42-59