共 11 条
- [1] Akçali E, 2000, PROCEEDINGS OF THE 2000 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, P1428, DOI 10.1109/WSC.2000.899121
- [2] [Anonymous], WAFER FABRICATION FA
- [3] [Anonymous], MANAGE SCI
- [4] Fowler J. W., 1995, Rep. 95062861A-TR
- [5] Habenicht I, 2002, PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, P1406, DOI 10.1109/WSC.2002.1166411
- [7] Simulation-based assessment of batching heuristics in semiconductor manufacturing [J]. PROCEEDINGS OF THE 2003 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2003, : 1338 - 1345
- [8] MONCH L, 2002, P 2002 MOD AN SEM MA, P95
- [9] SCHOMIG A, 2000, P 9 ASIM DED C SIM P, P55