Feasibility Analysis of the 55 MWe Gedongsongo Geothermal Power Plant Project

被引:0
|
作者
Wirawan, Arizona Yoris [2 ]
Pramudiohadi, Eko Widi [1 ]
Nugroho, Ady Setya [2 ]
Iswahyu, Padlil [2 ]
Tanbar, Fefria [2 ]
机构
[1] Univ Pembangunan Nas Vet Yogyakarta, Dept Petr Engn, Jl Padjajaran Lingkar Utara, Sleman 55283, Yogyakarta, Indonesia
[2] PT PLN Persero, Dept Renewable Energy, Jakarta, Indonesia
来源
2ND INTERNATIONAL CONFERENCE ON EARTH SCIENCE, MINERAL, AND ENERGY | 2020年 / 2245卷
关键词
Geothermal power plant; Feasibility; Sensitivity analysis; Electricity tariff;
D O I
10.1063/5.0007284
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Geothermal is a potential renewable energy source to be developed in Indonesia. Indonesia's geothermal energy potential is recorded at 28,579 MW but only used for electricity generation of around 1,948.5 MW. Investment in geothermal power plants is an investment that is capital intensive with high investment risk factors. This study aims to determine the financial feasibility of investing in geothermal power plants in the Gedongsongo geothermal field with 55 MWe of potential electrical energy. Also, research is conducted to find out from the beginning of the project implementation to the end of the project's economic life and to determine the feasibility level of the financial feasibility of investment in the project. The results of investment analysis using sensitivity analysis, indicating that price movements in project calculations have a significant influence on changes in NPV. Sensitivity analysis is carried out on several parameters that affect the project value (in the form of NPV) with a Low Case of 70% parameter value and High Case of 130%. The inflation rate for operating costs such as O & M, Make-Up Well Drilling, and Overhaul is assumed to be 2% per year. Project financing is expected to originate from personal capital of 30% and loans of 70% with interest rates (interest) of 4% per year. To get the value of the internal rate of return on personal capital or the Equity Internal Rate of Return by PLN standards of 14%, the electricity tariff for the Gedongsongo Geothermal power plant is 11.47 cents/ kWh.
引用
收藏
页数:7
相关论文
共 50 条
  • [21] Energy and exergy analysis of Kizildere Geothermal Power Plant, Turkey
    Ozturk, Harun Kemal
    Atalay, Oner
    Yilanci, Ahmet
    Hepbasli, Arif
    ENERGY SOURCES PART A-RECOVERY UTILIZATION AND ENVIRONMENTAL EFFECTS, 2006, 28 (15) : 1415 - 1424
  • [22] Performance Analysis and Optimization of a Hybrid Solar Geothermal Power Plant
    Maali, Rafika
    Khir, Tahar
    Ben Brahim, Ammar
    RECENT ADVANCES IN ENVIRONMENTAL SCIENCE FROM THE EURO-MEDITERRANEAN AND SURROUNDING REGIONS, VOLS I AND II, 2018, : 1581 - 1584
  • [23] Thermodynamic evaluation of a geothermal power plant for advanced exergy analysis
    Kecebas, Ali
    Gokgedik, Harun
    ENERGY, 2015, 88 : 746 - 755
  • [24] Analysis of Geothermal Power Plant Process Design for Lahendong Area
    Hakim, Alhafiz Taufiqul
    Jasmine, Aisyah Putri Prameswari
    Juwari
    Renanto
    JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2024,
  • [25] CFD analysis of the combustion process in a boiler of a 160 MWe power plant: leakage influence
    C. V. Silva
    L. F. Dondoni
    C. Ermel
    P. L. Bellani
    D. A. Stradioto
    M. L. S. Indrusiak
    Journal of the Brazilian Society of Mechanical Sciences and Engineering, 2019, 41
  • [26] HEBER-BINARY-PROJECT - BINARY CYCLE GEOTHERMAL DEMONSTRATION POWER-PLANT
    LACY, RG
    NELSON, TT
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1983, 45 : 11 - 11
  • [27] The Bad Blumau geothermal project: a low temperature, sustainable and environmentally benign power plant
    Legmann, H
    GEOTHERMICS, 2003, 32 (4-6) : 497 - 503
  • [28] THERMALHYDRAULIC ANALYSIS OF THE STEAM GENERATOR DESIGN FOR THE 700 MWe INDIAN NUCLEAR POWER PLANT
    John, Benny
    Pietralik, John M.
    ICONE16: PROCEEDING OF THE 16TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2008, VOL 1, 2008, : 187 - 195
  • [29] Cost sensitivity analysis for a 100 MWe modular power plant and fusion neutron source
    Woodruff, S.
    Miller, R. L.
    FUSION ENGINEERING AND DESIGN, 2015, 90 : 7 - 16
  • [30] Preliminary analysis of dry-steam geothermal power plant by employing exergy assessment: Case study in Kamojang geothermal power plant, Indonesia
    Rudiyanto, Bayu
    Illah, IbnuAtho
    Pambudi, Nugroho Agung
    Cheng, Chin-Chi
    Adiprana, Reza
    Imran, Muhammad
    Saw, Lip Huat
    Handogo, Renanto
    CASE STUDIES IN THERMAL ENGINEERING, 2017, 10 : 292 - 301