Feasibility Analysis of the 55 MWe Gedongsongo Geothermal Power Plant Project

被引:0
|
作者
Wirawan, Arizona Yoris [2 ]
Pramudiohadi, Eko Widi [1 ]
Nugroho, Ady Setya [2 ]
Iswahyu, Padlil [2 ]
Tanbar, Fefria [2 ]
机构
[1] Univ Pembangunan Nas Vet Yogyakarta, Dept Petr Engn, Jl Padjajaran Lingkar Utara, Sleman 55283, Yogyakarta, Indonesia
[2] PT PLN Persero, Dept Renewable Energy, Jakarta, Indonesia
来源
2ND INTERNATIONAL CONFERENCE ON EARTH SCIENCE, MINERAL, AND ENERGY | 2020年 / 2245卷
关键词
Geothermal power plant; Feasibility; Sensitivity analysis; Electricity tariff;
D O I
10.1063/5.0007284
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Geothermal is a potential renewable energy source to be developed in Indonesia. Indonesia's geothermal energy potential is recorded at 28,579 MW but only used for electricity generation of around 1,948.5 MW. Investment in geothermal power plants is an investment that is capital intensive with high investment risk factors. This study aims to determine the financial feasibility of investing in geothermal power plants in the Gedongsongo geothermal field with 55 MWe of potential electrical energy. Also, research is conducted to find out from the beginning of the project implementation to the end of the project's economic life and to determine the feasibility level of the financial feasibility of investment in the project. The results of investment analysis using sensitivity analysis, indicating that price movements in project calculations have a significant influence on changes in NPV. Sensitivity analysis is carried out on several parameters that affect the project value (in the form of NPV) with a Low Case of 70% parameter value and High Case of 130%. The inflation rate for operating costs such as O & M, Make-Up Well Drilling, and Overhaul is assumed to be 2% per year. Project financing is expected to originate from personal capital of 30% and loans of 70% with interest rates (interest) of 4% per year. To get the value of the internal rate of return on personal capital or the Equity Internal Rate of Return by PLN standards of 14%, the electricity tariff for the Gedongsongo Geothermal power plant is 11.47 cents/ kWh.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Economic Analysis of the 55 MWe Gedongsongo Geothermal Power Plant Project
    Wirawan, Arizona Yoris
    Pramudiohadi, Eko Widi
    2019 9TH INTERNATIONAL CONFERENCE ON POWER AND ENERGY SYSTEMS (ICPES), 2019,
  • [2] Thermodynamic and economic analysis for the pre-feasibility study of a binary geothermal power plant
    Budisulistyo, Denny
    Krumdieck, Susan
    ENERGY CONVERSION AND MANAGEMENT, 2015, 103 : 639 - 649
  • [3] Environmental feasibility analysis of a coal fired power plant project in Gadani, Pakistan
    Ali, Syed Muhammad Hassan
    Fahrioglu, Murat
    Zuberi, Muhammad Jibran Shahzad
    Qureshi, Fassahat Ullah
    INTERNATIONAL JOURNAL OF GLOBAL WARMING, 2017, 11 (04) : 412 - 430
  • [4] Performance analysis of Germencik Geothermal Power Plant
    Unverdi, Murat
    Cerci, Yunus
    ENERGY, 2013, 52 : 192 - 200
  • [5] Thermodynamic analysis of a binary geothermal power plant
    Ozcan, Zekeriya
    Ekici, Ozgur
    INTERNATIONAL JOURNAL OF EXERGY, 2021, 36 (01) : 76 - 97
  • [6] DEVELOPMENT OF PLANT PERFORMANCE ANALYSIS SYSTEM FOR GEOTHERMAL POWER PLANT
    Nakao, Yoshinobu
    Takahashi, Toru
    Watanabe, Yutaka
    PROCEEDINGS OF THE ASME POWER CONFERENCE - 2011, VOL 2, 2012, : 551 - 555
  • [7] Feasibility and analysis of Tidal Power Plant
    Shahbaz, Amir
    Asif, Muhammad
    Mujeeb-ur-Rehman
    17TH IEEE INTERNATIONAL MULTI TOPIC CONFERENCE 2014, 2014, : 483 - 487
  • [8] Feasibility study of a geothermal power plant with a double-pipe heat exchanger
    Galoppi, G.
    Biliotti, D.
    Ferrara, G.
    Carnevale, E. A.
    Ferrari, L.
    69TH CONFERENCE OF THE ITALIAN THERMAL ENGINEERING ASSOCIATION, ATI 2014, 2015, 81 : 193 - 204
  • [9] Energy, exergy, and economic analysis of a geothermal power plant
    Kazemi H.
    Ehyaei M.A.
    Advances in Geo-Energy Research, 2018, 2 (02): : 190 - 209
  • [10] Performance analysis of the Chena binary geothermal power plant
    Aneke, Mathew
    Agnew, Brian
    Underwood, Chris
    APPLIED THERMAL ENGINEERING, 2011, 31 (10) : 1825 - 1832