Allocation of reliability-redundancy and spares inventory under Poisson fleet expansion

被引:20
作者
Jin, Tongdan [1 ]
Taboada, Heidi [2 ]
Espiritu, Jose [2 ]
Liao, Haitao [3 ]
机构
[1] Texas State Univ, Ingram Sch Engn, San Marcos, TX 78666 USA
[2] Univ Texas El Paso, Dept Ind Mfg & Syst Engn, El Paso, TX 79968 USA
[3] Univ Arkansas, Dept Ind Engn, Logist & Entrepreneurship, Fayetteville, AR 72701 USA
关键词
Nonstationary demand; product-service integration; installed base; reliability-inventory optimization; performance-based contract; SERVICE PARTS LOGISTICS; COMPONENT REDUNDANCY; GENETIC-ALGORITHM; OPTIMIZATION; SYSTEM; MULTIECHELON; AVAILABILITY; MAINTENANCE; NETWORK; MODEL;
D O I
10.1080/24725854.2016.1271963
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article proposes an integrated product-service model to ensure the system availability by concurrently allocating reliability, redundancy, and spare parts for a variable fleet. In the literature, reliability and inventory allocation models are often developed based on a static installed base. The decision becomes really challenging during new product introduction, as the demand for spare parts is nonstationary due to the fleet expansion. Under the system availability criteria, our objective is to minimize the fleet costs associated with design, manufacturing, and after-sales support. We tackle this reliability-inventory allocation problem in two steps. First, to accommodate the fleet growth effects, the nonstationary spare parts demand stream is modeled as a sum of randomly delayed renewal processes. When the component's failure time is exponential, the mean and variance of the lead time inventory demand are explicitly derived. Second, we propose an adaptive base stock policy against the time-varying parts demand rate. A bisection search combined with metaheuristics is used to find the optimal solution. Numerical examples show that spare parts inventory results in a lower fleet cost under short-term performance-based contracts, whereas reliability-redundancy is preferred for long-term service programs.
引用
收藏
页码:737 / 751
页数:15
相关论文
共 38 条
[1]  
Basten R.J. I., 2014, Surveys in Operations Research and Management Science, V19, P34, DOI [10.1016/j.sorms.2014.05.002, DOI 10.1016/J.SORMS.2014.05.002]
[2]   Periodic inspection frequency and inventory policies for a k-out-of-n system [J].
Bjarnason, Erik Tryggvi Striz ;
Taghipour, Sharareh .
IIE TRANSACTIONS, 2016, 48 (07) :638-650
[3]   Reliability Modeling and Prediction of Systems With Mixture of Units [J].
Cheng, Yao ;
Elsayed, E. A. .
IEEE TRANSACTIONS ON RELIABILITY, 2016, 65 (02) :914-928
[4]   ON THE COMPUTATIONAL-COMPLEXITY OF RELIABILITY REDUNDANCY ALLOCATION IN A SERIES SYSTEM [J].
CHERN, MS .
OPERATIONS RESEARCH LETTERS, 1992, 11 (05) :309-315
[5]   System optimization with component reliability estimation uncertainty: A multi-criteria approach [J].
Coit, DW ;
Jin, TD ;
Wattanapongsakorn, N .
IEEE TRANSACTIONS ON RELIABILITY, 2004, 53 (03) :369-380
[6]   Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems [J].
de Smidt-Destombes, Karin S. ;
van der Heijden, Matthieu C. ;
van Harten, Aart .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 118 (01) :260-268
[7]   Models for multi-echelon repairable item inventory systems with limited repair capacity [J].
Diaz, A ;
Fu, MC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 97 (03) :480-492
[8]   Role of BIT in support system maintenance and availability [J].
Drees, R ;
Young, N .
IEEE AEROSPACE AND ELECTRONIC SYSTEMS MAGAZINE, 2004, 19 (08) :3-7
[9]   A supply network model with base-stock control and service requirements [J].
Ettl, M ;
Feigin, GE ;
Lin, GY ;
Yao, DD .
OPERATIONS RESEARCH, 2000, 48 (02) :216-232
[10]  
FARRELL J, 1986, AM ECON REV, V76, P940