Evaluation of labor hiring policies in construction projects performance using system dynamics

被引:11
作者
Abbaspour, Soroush [1 ]
Dabirian, Shahin [2 ]
机构
[1] Islamic Azad Univ, Dept Construct Engn & Management, Isfahan Khorasgan Branch, Esfahan, Iran
[2] Art Univ Isfahan, Dept Architecture, Esfahan, Iran
关键词
Performance management; Human resource management; Construction projects; System dynamics; Earned value management; Labour hiring policies; STRATEGIC MANAGEMENT; RESOURCE-MANAGEMENT; MODEL;
D O I
10.1108/IJPPM-03-2019-0134
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The purpose of this paper is to assess different labor hiring policies for construction projects using system dynamics (SD) which have a considerable impact on project performance. Time intervals and work crew composition are two such policies. Through the implementation of a variety of policies, a managerial opportunity presents itself for the effective allocation of human resources and improvement in project performance. Design/methodology/approach The study developed a dynamic model to assess different labor hiring policies using SD based on literature. To further distinguish between findings, the effects of the applied policies on performance were considered using earned value management. Based on a real case for validating the model, the paper discusses the potential benefits of the model, including: having a systematic and holistic view, considering dynamic the labor need and allocation, identifying alternative strategies for performance improvement and simulating the reality of the projects in a virtual model. Findings The achieved simulation results show how different hiring policies affect project performance. This research model can aid decision makers to assess labor hiring policies in various time intervals with different compositions and assist them in selecting the best policies for effective implementation of project. Originality/value The proposed model would be a major attempt using SD to model labor hiring policies more accurate in construction projects performance. In fact, an accurate estimate of labor needed, along with the proper planning and implementing of various labor hiring policies, presents a managerial opportunity whereby the effective allocation of workforces can be optimized leading to drastic improvement in project performance.
引用
收藏
页码:22 / 43
页数:22
相关论文
共 62 条
[1]  
Abdel-Hamid T., 1991, SOFTWARE PROJECT DYN
[2]  
Abdel-Hamid T, 1984, THESIS
[3]   Managing Construction Projects through Dynamic Modeling: Reviewing the Existing Body of Knowledge and Deriving Future Research Directions [J].
Abotaleb, Ibrahim S. ;
El-adaway, Islam H. .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (06)
[4]  
Aghazadeh S., 2003, WORK STUDY, V52, P201, DOI DOI 10.1108/00438020310479045
[5]   Performance-based control of variability and tolerance in off-site manufacture and assembly: optimization of penalty on poor production quality [J].
Arashpour, Mehrdad ;
Heidarpour, Amin ;
Nezhad, Ali ;
Hosseinifard, Zahra ;
Chileshe, Nicholas ;
Hosseini, Reza .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2020, 38 (06) :502-514
[6]  
Armstrong M., 2003, A handbook of human resource management practice
[7]   Forecasting construction staffing for transportation agencies [J].
Bell, LC ;
Brandenburg, SG .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2003, 19 (03) :116-120
[8]  
Belout A., 2004, International Journal of Project Management, V22, P1, DOI 10.1016/S0263-7863(03)00003-6
[9]   Experimenting lean dynamic performance management systems design in SMEs [J].
Bianchi, Carmine ;
Winch, Graham ;
Cosenz, Federico .
INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2018, 67 (07) :1234-1251
[10]   Supporting process improvements with process mapping and system dynamics [J].
Bowles, David E. ;
Gardiner, Lorraine R. .
INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2018, 67 (08) :1255-1270