Study on Reserve Requirement for Wind Power Penetration based on the Cost/Reliability Analysis

被引:0
作者
Shin, Je-Seok [2 ]
Kim, Jin-O [2 ]
Bae, In-Su [1 ]
机构
[1] Kangwon Natl Univ, Dept Elect Engn, Samcheok, South Korea
[2] Hanyang Univ, Dept Elect Engn, Seoul, South Korea
基金
新加坡国家研究基金会;
关键词
Wind power uncertainty; Reserve requirement; Scheduling stage; Contingency stage; Cost/Reliability analysis; SPINNING RESERVE; GENERATION; EXPANSION; IMPACTS; SYSTEMS; MARKET;
D O I
10.5370/JEET.2017.12.4.1397
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
As the introduction of wind power is steadily increasing, negative effects of wind power become more important. To operate a power system more reliable, the system operator needs to recognize the maximum required capacity of available generators for a certain period. For recognizing the maximum capacity, this paper proposes a methodology to determine an optimal reserve requirement considering wind power, for the certain period in the mid-term perspective. As wind speed is predicted earlier, the difference of the forecasted and the actual wind speed becomes greater. All possible forecast errors should be considered in determining optimal reserve, and they are represented explicitly by the proposed matrix form in this paper. In addition, impacts of the generator failure are also analyzed using the matrix form. Through three main stages which are the scheduling, contingency and evaluation stages, costs associated with power generation, reserve procurement and the usage, and the reliability cost are calculated. The optimal reserve requirement is determined so as to minimize the sum of these costs based on the cost/reliability analysis. In case study, it is performed to analyze the impact of wind power penetration on the reserve requirement, and how major factors affect it.
引用
收藏
页码:1397 / 1405
页数:9
相关论文
共 19 条
  • [1] Anthony P., 2011, IEEE T POWER SYSTEMS, V26, P2197
  • [2] Billinton R., 1996, RELIABILITY EVALUATI, V2nd ed., DOI DOI 10.1007/978-1-4615-7731-7
  • [3] An electricity market with a probabilistic spinning reserve criterion
    Bouffard, F
    Galiana, FD
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (01) : 300 - 307
  • [4] Stochastic security for operations planning with significant wind power generation
    Bouffard, Francois
    Galiana, Francisco D.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (02) : 306 - 316
  • [5] Impact of wind power on sizing and allocation of reserve requirements
    De Vos, Kristof
    Morbee, Joris
    Driesen, Johan
    Belmans, Ronnie
    [J]. IET RENEWABLE POWER GENERATION, 2013, 7 (01) : 1 - 9
  • [6] Wind generation, power system operation, and emissions reduction
    Denny, E
    O'Malley, M
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (01) : 341 - 347
  • [7] Long-Term Reserve Expansion of Power Systems With High Wind Power Penetration Using Universal Generating Function Methods
    Ding, Yi
    Wang, Peng
    Goel, Lalit
    Loh, Poh Chiang
    Wu, Qiuwei
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (02) : 766 - 774
  • [8] Eriksen P. B., 2005, IEEE Power & Energy Magazine, V3, P65, DOI 10.1109/MPAE.2005.1524622
  • [9] The IEEE reliability test system - 1996
    Grigg, C
    Wong, P
    Albrecht, P
    Allan, R
    Bhavaraju, M
    Billinton, R
    Chen, Q
    Fong, C
    Haddad, S
    Kuruganty, S
    Li, W
    Mukerji, R
    Patton, D
    Rau, N
    Reppen, D
    Schneider, A
    Shahidehpour, M
    Singh, C
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) : 1010 - 1018
  • [10] Generation expansion planning in wind-thermal power systems
    Kamalinia, S.
    Shahidehpour, M.
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2010, 4 (08) : 940 - 951