A Risk Analysis and Ranking Application for Lifting Vehicles Used in Construction Sites with Integrated AHP and Fine-Kinney Approach

被引:10
作者
Yilmaz, Fatih [1 ]
Ozcan, Mehmet Selim [2 ]
机构
[1] Bandirma Onyedi Eylul Univ, Dept Labour Econ & Ind Relat, TR-10200 Merkez Yerleske, Balikesir, Turkey
[2] Yildiz Tech Univ, Dept Mech Engn, TR-34349 Istanbul, Turkey
关键词
analytical hierarchy process; lifting equipments; fine-kinney; occupational health and safety; integrated risk analysis; ranking method; FUZZY AHP; OCCUPATIONAL-SAFETY; DECISION; SELECTION; CRITERIA;
D O I
10.12913/22998624/111779
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Risk scoring methods applied in risk assessments used in Turkey, differ from each other in terms of analysis methods, scoring the risks, presumption and sensitivity levels. This article aims to eliminate the effects of divergent results of different risk analyses of lifting equipments used in the building industry and develop a practical hybrid risk analysis and ranking method. In this study risks of lifting equipments used in the building industry were scored by conventional Fine-Kenney risk analysis method first. Secondly, with the experience of previous accidents on construction sites, the reasons of accidents were sorted into 7 main criteria, which being 'Demographic', 'Behavioral', 'Machine Related', 'Working Environment Related', 'Economical', 'Administrative' and 'Organizational' criteria and related sub-criteria. Developing these criteria was supported by the experience of inspections carried out by labour inspectors. The weighted scores of these criteria were calculated by AHP method using a questionnaire applied to 14 experienced labor inspectors. The weighted scores obtained by the analytical hierarchy process method (AHP) were multiplied by the scores obtained by Fine-Kinney risk assessment method and a new integrated risk assessment and ranking application was introduced. With this application, a different priority rank was created and which risk to be eliminated primarily was determined.
引用
收藏
页码:152 / 161
页数:10
相关论文
共 26 条
[1]   Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP [J].
Abdelgawad, Mohamed ;
Fayek, Aminah Robinson .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (09) :1028-1036
[2]   COMPREHENSIVE RISK MANAGEMENT USING FUZZY FMEA AND MCDA TECHNIQUES IN HIGHWAY CONSTRUCTION PROJECTS [J].
Ahmadi, Mohsen ;
Behzadian, Kourosh ;
Ardeshir, Abdollah ;
Kapelan, Zoran .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (02) :300-310
[3]  
Alkoc A., 2018, KARAELMAS J OCCUPATI, V2, P1
[4]   Assessment of safety culture among job positions in high-rise construction: a hybrid fuzzy multi criteria decision-making (FMCDM) approach [J].
Ardeshir, A. ;
Mohajeri, M. .
INTERNATIONAL JOURNAL OF INJURY CONTROL AND SAFETY PROMOTION, 2018, 25 (02) :195-206
[5]  
FINE WT, 1971, J SAFETY RES, V3, P157
[6]   Fuzzy rule-based Fine-Kinney risk assessment approach for rail transportation systems [J].
Gul, Muhammet ;
Celik, Erkan .
HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2018, 24 (07) :1786-1812
[7]   A new Fine-Kinney-based risk assessment framework using FAHP-FVIKOR incorporation [J].
Gul, Muhammet ;
Guven, Busra ;
Guneri, Ali Fuat .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2018, 53 :3-16
[8]  
Gulsun B., 2016, ULUSLARARASI HAKEMLI, V1, P39
[9]   An occupational safety risk analysis method at construction sites using fuzzy sets [J].
Gurcanli, G. Emre ;
Mungen, Ugur .
INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 2009, 39 (02) :371-387
[10]   EVALUATION CRITERIA OF THE BELT CONVEYOR USING THE AHP METHOD AND SELECTION OF THE RIGHT CONVEYOR BY HURWITZ METHOD [J].
Jovcic, Stefan ;
Prusa, Petr ;
Nikolicic, Svetlana .
ADVANCES IN SCIENCE AND TECHNOLOGY-RESEARCH JOURNAL, 2018, 12 (02) :137-143