Robust Operation of Hybrid Solar-Wind Power Plant with Battery Energy Storage System

被引:5
作者
Bakhtvar, Mostafa [1 ]
Al-Hinai, Amer [2 ]
机构
[1] EirGrid Plc, Future Operat Innovat & Planning, Dublin D04 FW28, Ireland
[2] Sultan Qaboos Univ, Elect & Comp Engn, Muscat 123, Oman
关键词
hybrid; wind energy; solar energy; BESS; robust; optimal; dispatch; energy management system; BIDDING STRATEGY; GENERATION; MICROGRIDS; OPTIMIZATION;
D O I
10.3390/en14133781
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The intraday continuous electricity market (ICM) is a potential target market for the Dispatchable Hybrid Renewable solar-wind-battery energy storage system (BESS) power plant (DHRB). However, the uncertainty of the electricity price jeopardizes economic justification of BESS operation, an essential component of DHRB. Using the duality theory, this paper proposes a unilevel mixed-integer linear programming rolling-approach-based robust optimal scheduling tool for DHRB that keeps BESS operation optimal should the worst price scenario occur. It reflects BESS's degradation as penalty factors and also integrates a BESS degradation model in the scheduling tool for better assessment of the available resources through the BESS's lifetime. This tool aids the DHRB operator to decide the power offer to the ICM in such a way that the BESS's operation remains optimal. A case study is carried out to demonstrate the application of the proposed tool. Both the long-term and short-term losses/benefits of utilizing this tool for scheduling DHRB in the ICM are investigated at various uncertainty levels. It is shown that there will be a risk of loss of income for the DHRB in the short-term due to increased nondispatchable energy. However, by limiting the use of BESS to only those settlement periods that are either certainly profitable or unavoidable, the lifetime of BESS can potentially be extended. Hence, this can result in more income by the DHRB power plant in the long-term.
引用
收藏
页数:18
相关论文
共 38 条
[1]   An Effective Power Dispatch Control Strategy to Improve Generation Schedulability and Supply Reliability of a Wind Farm Using a Battery Energy Storage System [J].
Abu Abdullah, Md ;
Muttaqi, K. M. ;
Sutanto, Danny ;
Agalgaonkar, A. P. .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2015, 6 (03) :1093-1102
[2]   Optimal Sizing of a Hybrid Wind-Photovoltaic-Battery Plant to Mitigate Output Fluctuations in a Grid-Connected System [J].
Al Shereiqi, Abdullah ;
Al-Hinai, Amer ;
Albadi, Mohammed ;
Al-Abri, Rashid .
ENERGIES, 2020, 13 (11)
[3]   An Accurate, Light-Weight Wind Speed Predictor for Renewable Energy Management Systems [J].
Al-Zadjali, Saira ;
Al Maashri, Ahmed ;
Al-Hinai, Amer ;
Al-Yahyai, Sultan ;
Bakhtvar, Mostafa .
ENERGIES, 2019, 12 (22)
[4]   A Dynamic Risk-Constrained Bidding Strategy for Generation Companies Based on Linear Supply Function Model [J].
Ansari, Bananeh ;
Rahimi-Kian, Ashkan .
IEEE SYSTEMS JOURNAL, 2015, 9 (04) :1463-1474
[5]  
Bakhtvar M., 2021, IET RENEW POWER GEN, V15, P1848
[6]  
Bakhtvar M, 2020, IEEE INT ENER CONF, P238, DOI 10.1109/ENERGYCon48941.2020.9236559
[7]   Offering Strategy Via Robust Optimization [J].
Baringo, Luis ;
Conejo, Antonio J. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (03) :1418-1425
[8]   Adaptive Trading in Continuous Intraday Electricity Markets for a Storage Unit [J].
Bertrand, Gilles ;
Papavasiliou, Anthony .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2020, 35 (03) :2339-2350
[9]   Pathway to 100% Renewable Electricity [J].
Blakers, Andrew ;
Stocks, Matthew ;
Lu, Bin ;
Cheng, Cheng ;
Stocks, Ryan .
IEEE JOURNAL OF PHOTOVOLTAICS, 2019, 9 (06) :1828-1833
[10]   Accelerated Distributed Hybrid Stochastic/Robust Energy Management of Smart Grids [J].
Chang, Xinyue ;
Xu, Yinliang ;
Gu, Wei ;
Sun, Hongbin ;
Chow, Mo-Yuen ;
Yi, Zhongkai .
IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2021, 17 (08) :5335-5347