Development of a Scanning Support System Using Augmented Reality for 3D Environment Model Reconstruction

被引:3
作者
Harazono, Yuki [1 ]
Ishii, Hirotake [1 ]
Shimoda, Hiroshi [1 ]
Kouda, Yuya [2 ]
机构
[1] Kyoto Univ, Grad Sch Energy Sci, Sakyo Ku, Kyoto, Kyoto, Japan
[2] Japan Atom Energy Agcy, Fugen Decommissioning Engn Ctr, Tsuruga, Fukui, Japan
来源
INTELLIGENT HUMAN SYSTEMS INTEGRATION 2019 | 2019年 / 903卷
关键词
Augmented reality; Model reconstruction; Environment scanning support;
D O I
10.1007/978-3-030-11051-2_69
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
3D reconstruction models are useful for many situations in maintenance and decommissioning work at nuclear power plants (NPPs). There is a method to make the models from color and depth images. When using the method, it is necessary to scan a target environment without missing in order to make detailed and precise models. However, work sites at NPP are very complicated, and it is difficult to scan without missing. In this study, we aim to develop a scanning support system that enables users to make 3D reconstruction models without missing even in a very complicated environment such as NPPs. The system reminds and encourages users to scan work sites by visualizing unscanned area using an algorithm extended truncated signed distance function.
引用
收藏
页码:460 / 464
页数:5
相关论文
共 6 条
  • [1] Choi S., AUGMENTED ICL NUIM D
  • [2] Curless B., 1996, Computer Graphics Proceedings. SIGGRAPH '96, P303, DOI 10.1145/237170.237269
  • [3] Development of an information reference system using reconstruction models of nuclear power plants
    Harazono, Yuki
    Kimura, Taro
    Ishii, Hirotake
    Shimoda, Hiroshi
    Kouda, Yuya
    [J]. NUCLEAR ENGINEERING AND TECHNOLOGY, 2018, 50 (04) : 606 - 612
  • [4] Izadi Shahram, 2011, UIST
  • [5] Remondino F, 2011, INT ARCH PHOTOGRAMM, V38-1, P25
  • [6] Automatic creation of semantically rich 3D building models from laser scanner data
    Xiong, Xuehan
    Adan, Antonio
    Akinci, Burcu
    Huber, Daniel
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 31 : 325 - 337