Total quality management (TQM) implementation in the Nigerian construction industry

被引:13
|
作者
Egwunatum, Samuel Ikechukwu [1 ]
Anumudu, Anthony Chukwunedum [2 ]
Eze, Emmanuel Chidiebere [1 ]
Awodele, Imoleayo Abraham [2 ]
机构
[1] Fed Univ Technol Owerri, Quant Surveying, Owerri, Nigeria
[2] Fed Univ Technol Owerri, Dept Quant Surveying, Owerri, Nigeria
关键词
Total quality management; TQM practices; TQM principles; Structural failure; Project delivery; Nigeria; PERFORMANCE; IMPROVEMENT; IMPACT;
D O I
10.1108/ECAM-08-2020-0639
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Lack of strict compliance to the principles of total quality management (TQM) by construction organizations has brought about poor quality of the finished building projects. This has been blamed for the incessant structural failure reported in Nigeria. This study appraised TQM implementation in the Nigerian construction industry, with a view to mitigating structural failure rate of construction projects. To achieve this aim, the study aims to assess the practice level of TQM and the factors hindering TQM implementation on construction projects. Design/methodology/approach The study utilized a well-structured questionnaire and convenient sampling method in the gathering and sampling of data among construction professionals in Imo state, Nigeria. Data analyses were done using, frequency, percentage, mean analytics and Pareto analysis. Findings The study revealed that major practice of TQM principles with respect to structural failure rate are purchasing: ensuring the procurement of materials of the specified quality standard, ensuring the use of a quality improvement construction process of the organization, site management responsibility: this entails ensuring quality supervision by the project management leadership and monitoring and control of quality during the construction to guarantee firm observance quality standards. Also, the major factors hindering TQM implementation on construction projects are: inadequacy of the necessary machineries, equipment, tools and facilities for the effective execution of work on construction site; breakdown in communication and information exchange between the management and supervisory teams on site; poor attitudes and strategies toward maintenance of equipment, tools and machines; and absence of prompt salary and incentive payment. It was recommended that construction firms must require the suppliers of construction materials to strictly comply with quality specification evidence in quality certification of delivered materials to mitigate structural failure. Research limitations/implications This study appraised TQM implementation in the construction industry of Nigeria, with emphasis on Imo state. The study underscores the practice level of TQM and the key factors hindering TQM implementation on construction projects. Following the localized geographical limitation of the study area, a similar research in other part/states of Nigeria or even in other developing countries of African is necessary. Practical implications The practices level of TQM and the factors hindering TQM implementation were identified. This will be useful in guiding construction firms, other industry's key stakeholders and regulatory agencies in bringing about a sustainable quality management system for improve profit and value maximization and avoiding incessant structural failure. Originality/value This is one of the few studies that have assessed the practice level of TQM and the factors hindering TQM implementation on construction projects in Nigeria. This study took place in Imo state with records of periodic structural failure and building collapse.
引用
收藏
页码:354 / 382
页数:29
相关论文
共 50 条
  • [41] Critical success factors for Kaizen implementation in the Nigerian construction industry
    Omotayo, Temitope Seun
    Kulatunga, Udayangani
    Bjeirmi, Bassam
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2018, 67 (09) : 1816 - 1836
  • [42] Current status of Total Quality Management implementation in the Turkish Cement Industry
    Öztas, A
    Özbay, E
    Yeginobali, A
    TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2004, 15 (07) : 985 - 999
  • [43] An empirical implementation model of total quality management in construction: Southern India
    Gowthami, N. R.
    Sridhar, C. N., V
    Ramana, N. Venkata
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (15) : 3023 - 3033
  • [44] CONTRIBUTION OF THE ORGANIZATIONAL BEHAVIOR MANAGEMENT (OBM) TO THE TOTAL QUALITY MANAGEMENT (TQM)
    Vargas Halabi, Tomas
    REVISTA COSTARRICENSE DE PSICOLOGIA, 2007, 26 (39): : 35 - 42
  • [45] Implementation of total quality management (TQM) in malay-sian industrialized building system (IBS) projects
    Alawag, Aawag Mohsen
    Alaloul, Wesam Salah
    Liew, M. S.
    Musarat, Muhammad Ali
    Baarimah, Abdullah O.
    REVISTA DE LA CONSTRUCCION, 2023, 22 (01): : 74 - +
  • [46] Organizational culture and total quality management practices in Indian construction industry
    Patyal, Vishal Singh
    Ambekar, Sudhir
    Prakash, Anand
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2020, 69 (05) : 895 - 913
  • [47] Impact of total quality management on the sustainable performance in the Palestinian construction industry
    Jabi, Ismael
    Faour, Maryana
    Saleh, Yahya
    TQM JOURNAL, 2024,
  • [48] A Survey on the Implementation of Total Quality Management (TQM) at Manufacturing Industries in North Region, Kingdom of Saudi Arabia
    Yusoff, W. A. Y.
    Badawi, Issam
    Aichouni, M.
    Boujelbene, Mohamad
    PROCEEDINGS OF 2016 2ND INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT (ICIM2016), 2016,
  • [49] MEDIATING ROLE OF EMPOWERMENT BETWEEN TOTAL QUALITY MANAGEMENT (TQM) AND SERVICE RECOVERY PERFORMANCE IN THE HOTEL INDUSTRY
    Al-Ababneh, Mukhles M.
    Al-Sabi, Samer M.
    Al-Shakhsheer, Firas J.
    Habiballah, Ma'moun A.
    JOURNAL OF SPATIAL AND ORGANIZATIONAL DYNAMICS, 2018, 6 (03): : 286 - 313
  • [50] Total quality management in the construction industry in Hong Kong: A supply chain management perspective
    Wong, A
    Fung, P
    TOTAL QUALITY MANAGEMENT, 1999, 10 (02): : 199 - 208